Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 7, 2026 at 8:00 PM
Updated May 16, 2026
Site work for a water / sewer project in Corpus Christi, Texas. Completed plans call for site work for a water / sewer project.
**As of May 07, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.** The project consists of a 250,000-gallon underground storage tank and pump station at the Oso Water Reclamation Plant and approximately 10.5 miles of 36-inch pipe. Also included in the scope of work are modifications at the Oso Water Reclamation Plant to divert effluent flows to the proposed underground storage tank. In addition, chemical feed system additions for the removal of phosphorus are included in the scope of work. Refer to Section 2 and Attachment D for project overview and background documents. Ardurra Group, Inc. is seeking a qualified Construction Manager at Risk (CMAR) to provide construction manager at risk services in connection with the final design and to perform the construction of the Reclaimed Water for Industrial Reuse Project. The estimated construction cost for this project is $108 million dollars. Each proposer is required to submit a Qualifications Packet and a Cost Proposal separately, and both should be submitted in a separate, sealed envelope. Question Deadline 04/16/2026 at 5:00 PM CT
Post-Bid
Water / Sewer
$108,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 24, 2026
September 1, 2026
Multiple Locations, Corpus Christi, TX
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
