Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 15, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a water / sewer project in San Lorenzo, California. Completed plans call for site work for a water / sewer project.
The project contractor shall furnish all tools, equipment, apparatus, facilities, labor and material necessary to perform and complete in a good and workmanlike manner the construction of the SEWER COLLECTION SYSTEM PIPELINE REHABILITATION AND REPLACEMENT PROJECT PHASE 10 project as shown in the project technical specifications and plans and in accordance with the contract documents within 300 calendar days of the project commencement date specified in the notice to proceed. The project work is generally described as: the replacement of 13,016 linear feet of 6 and 8-inch vitrified clay pipe (VCP) with 8-inch high density polyethylene pipe (HDPE); 1,733 linear feet of 8-inch VCP with 10-inch HDPE pipe; 279 linear feet of 12-inch VCP with 12-inch HDPE pipe; 414 linear feet of 15-inch VCP with 18-inch HDPE pipe and the reconnection of all laterals and re-channelization of all manholes, as shown on the plans and specifications. All bids must be made on forms included in the bid package. A Class A California contractor's license is required. Bidders and all proposed subcontractors must be currently registered and qualified to perform public work pursuant to California Labor Code Section 1725.5. A successful bidder must comply with all prevailing wage laws and related requirements in the Contract Documents. The District reserves the right to reject any and all bids and/or to waive any bid irregularities to the extent permitted by law. All bids will remain valid for 90 days after the bid opening. Except as permitted by law and subject to all applicable remedies, bidders may not withdraw their bid during the 90-day period after the bid opening. Any bidder that discovers any apparent conflicts, errors, or ambiguities contained in the bid package or between the contents of the bid package and the Project site, or that has questions or requires clarification concerning the bid package or its intent must inform the District in writing as soon as reasonably possible, but no later than five (5) working days before the date specified for bid opening. Question Deadline 05/07/2026
Post-Bid
Water / Sewer
$6,350,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2026
July 13, 2026
Multiple Locations, San Lorenzo, CA
Related To This Project
San Lorenzo, CA
Bid Date: May 14 2026
San Lorenzo, CA
Bid Date: May 05 2026
San Lorenzo, CA
Bid Date: Apr 16 2026
San Lorenzo, CA
Bid Date: Apr 01 2026
San Lorenzo, CA
Bid Date: Mar 17 2026
San Lorenzo, CA
Bid Date: Mar 05 2026
San Lorenzo, CA
Bid Date: Feb 20 2026
San Lorenzo, CA
Bid Date: Jan 13 2026
San Lorenzo, CA
Bid Date: Jan 15 2026
San Lorenzo, CA
Bid Date: Dec 22 2025
San Lorenzo, CA
Bid Date: Feb 19 2021
San Lorenzo, CA
Bid Date: Sep 01 2021
San Lorenzo, CA
Bid Date: Sep 22 2021
San Lorenzo, CA
Bid Date: Jul 31 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
