BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work and paving for a bridge / tunnel in Topeka, Kansas. Conceptual plans call for the demolition of a bridge / tunnel; and bridge / tunnel.

Shawnee County Board of County Commissioners requests qualifications from consulting engineering firms for professional design and construction engineering inspection services for Bridge Project S-121068.00. The project includes: NE Shaffer Road Bridge over Little Muddy Creek – OSN 311 (removal and replacement) and NE 46th Street Bridge over the abandoned ATSF RR – BSN 437 (removal only). Scope of Work: For OSN 311 (NE Shaffer Road over Little Muddy Creek): - Prepare engineering plans, bidding documents, and cost estimates. - Prepare right-of-way plans and legal documents for appraising and acquiring necessary permanent and temporary construction easements; secure certificates of title for properties requiring easements; provide field survey staking for easements to be appraised and acquired. - Prepare a geotechnical engineering report for substructure elements related to the replacement bridge. - Prepare and submit all required permit applications to the Corps of Engineers, Kansas Department of Agriculture Division of Water Resources, and any other relevant Federal or State Agency. - Prepare utility plans and assist with utility coordination as per Shawnee County Design Criteria. - Provide construction engineering inspection services. For BSN 437 (NE 46th Street over Abandon ATSF RR): - Prepare engineering plans, bidding documents, and cost estimates for removing the NE 46th Street bridge over the abandoned ATSF RR and for regrading and replacing NE 46th Street pavement. - Provide construction engineering inspection services. Plans must comply with Kansas Department of Transportation (KDOT) Design Standards for Bridges and construction inspection services are to follow KDOT Standard Specifications and City of Topeka/Shawnee County Standard Technical Specifications, latest editions and addenda. Instructions to Bidders: - All prices and conditions must be provided. No additions or conditions not shown on this bid will be allowed. - Shawnee County reserves the right to accept or reject any part of, or all of, any bid or proposal. - Prices quoted should exclude Federal Excise Tax and Kansas Sales Tax. - Submitted prices must remain firm for ninety (90) days after the bid closing date. - All vendors must create an account on the Shawnee County electronic bid portal to receive or submit bid requests; all responses must be submitted through the portal. - In all communications, reference the specified quotation number.

Conceptual

Bridges / Tunnels

$2,000,000.00

Public - County

Demolition, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2026

June 1, 2027

Project location map

To be determined, Topeka, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.