Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 19, 2026

Remodeling of an educational facility in Palmyra, Missouri. Completed plans call for the remodel of a 14,422-square-foot educational facility.

The project is for ceiling grid and tile replacement at Palmyra Elementary School, covering 19 classrooms with a total of 14,422 square feet. Proposals must be received in hand by 3:00 p.m. on Wednesday, May 6, 2026. Further detailed information may be obtained at the Palmyra R-1 Central Office or by calling the listed number. All questions should be directed to the designated superintendent.

Post-Bid

Educational

$140,000.00

Public - City

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
41
Bidding Soon
811
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2026

June 5, 2026

Project location map

1703 S Main Street, Palmyra, MO

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed