BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 14, 2026

Site work and paving for a road / highway in Berrien Springs, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

2.58 mi of hot mix asphalt cold milling and resurface and permanent pavement markings on Red Bud Trail from US-12 to Bertand Road, Berrien County. This is a Local Agency project. 3% SBP Participation Required Net classification required for this project is 677 Cb In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N9-3A. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. MI DOT - 2605 021 - Hot Mix Asphalt Cold Milling and Resurface and Permanent Pavement Markings on Red Bud Trail Question Deadline 04/24/2026 All inquiries concerning the plans and proposal for this project are to be directed to: MDOT-eProposal@Michigan.gov E-mail Address, To be able to process and distribute an addendum, if required, all inquiries shall be made at least seven (7) calendar days before the letting.

Award

Roads / Highways

$617,507.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2026

June 1, 2026

Project location map

Red Bud Trail, Berrien Springs, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.