BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 20, 2026

Demolition and site work for a water / sewer project in Tranquillity, California. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.

Work consists of demolition of existing headworks piping and equipment, installation of a new packaged mechanically cleaned auger screen with ultrasonic sensors, manual bypass bar screen with removable screening basket, self-priming centrifugal pump with basket strainer and self-leveling floating strainers, flexible suction piping, spray wash system, stop logs, hose bibs with hose rack, new 6-inch and 10-inch piping and valves including plug valves, butterfly valves, and duckbill check valves, concrete pad, asphalt restoration, and electrical instrumentation improvements including new panel, conduit, wiring, and level sensors, complete per plans and specifications. All potential subcontractors are required to be prepared to provide a 100% Payment and Performance Bond from a U.S. Treasury-listed surety company, and GSE will reimburse subcontractors for the required bond premium, so provide your bond rate at the time of bid. The decision to bond any or all subcontractors shall be at the sole discretion of GSE Construction unless specific project contract documents have other requirements. For subcontracts greater than $100,000, performance and payment bonds in the amount equal to 100% of the subcontract price may be required, issued by satisfactory sureties, with the premium (not exceeding 1.75% of the subcontract amount) reimbursed by Contractor. Bond premiums must be listed as a separate line item. Subcontractors are required to execute a subcontract in substantially the form of Contractor's standard subcontract document, available for review at Contractor's offices. Question Deadline 04/17/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Quotes are sought for the following work: Survey, Temporary Bypass Systems, Demolition, Earthwork/Grading, Concrete, Concrete Reinforcement, Mechanically Cleaned Auger Screen, Manual Bar Screen, Self-Priming Centrifugal Pump, Basket Strainer, Floating Strainers, Flexible Suction Piping, Stop Logs/Stainless Steel Plates, Piping STL/DI/PVC, Plug Valves, Butterfly Valves, Duckbill Check Valves, Painting & Coating, Electrical. All equipment used must meet current C.A.R.B Regulations. Proof of Registration for Public Works Projects in California must be included with quote. GSE Construction is signatory to the Laborers Unions.

Bid Results

Water / Sewer

$653,576.00

Public - County

Demolition, Site Work

17

21

7

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2026

July 27, 2026

Project location map

S Levee Rd & S James Rd, Tranquillity, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.