Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 5, 2026 at 8:00 PM
Updated May 16, 2026
Renovation of a library in Pewaukee, Wisconsin. Completed plans call for the renovation of a library.
The Library is seeking a qualified contractor to remove and replace the existing Direct Digital Control System with a new DDC Building Automation System to control the HVAC systems within the building. The Library desires to remove and replace the existing Direct Digital Control System with a new DDC Building Automation System to control the HVAC systems within the building. Attached to this document are the original Controls submittal and the original Design Drawings that show both the HVAC equipment and the Controls to allow for a like-for-like replacement. It is anticipated that, at a minimum, the following items be included in part of the BAS Contractor's scope of work. The bidding contractor shall be a firm specializing and experienced in DDC control installation for no less than five years. Appendix A and Appendix B provide information on the Library's original and current system designs. Substantial Completion Date: October 1, 2026. Completion Date: October 15, 2026 The scope shall include material, labor, engineering, software, permits, tools, checkout, and certificates covering the following: o Provide a complete replacement Direct Digital Control System by Alerton, Andover, Automated Logic, Carrier, Delta, Honeywell, Schneider Electric, Siemens, Staefa, TAC, or Trane (or Approved Equal), and installed by a licensed Control Contractor. o New front end Operator Workstation, including new license and software for onsite control of the Building Automation System. The new BAS shall have web access to allow use from any device. o Provide programming, graphics, and commissioning of the new control system, including functional performance tests and point to point verification of the system. Functional performance tests and point to point verification results shall be provided to the Owner. Graphics shall show both setpoints and room temperatures to give feedback on which zones are not meeting setpoint. o The existing control panels, field wiring, conduit, and raceway may be reused, if it is applicable to the new BAS layout and design. The BAS Contractor shall provide any additional panels or field wiring required. o The existing field control devices, such as transformers, actuators, valves, relays, freezestats, and sensors (other than room temperature sensors) may be reused. o Furnish and install (25) new digital communicating touchscreen, wall zone temperature sensors to replace the existing thermostats, in the same location. Existing conduit and back boxes may be utilized. Zone temperature sensors shall have lock out provisions or setpoint adjustment limitations programmed to allow certain public facing thermostats to not be able to be adjusted by the public, or only minimally adjusted. o Furnish and install (25) new VAV terminal box controllers with all required temperature sensors. o Furnish and install new Master Controller front end with Web Access and power supply. o Furnish and install new field controller(s) for the control of the (2) boilers, (2) hot water pumps, (1) A/C, (1) AHU and associated components, and (2) Hot Water Valves. o Furnish and install (2) relays and (2) current sensors to control start/stop and monitor status of the (2) boiler pumps that cannot currently be controlled or seen by the BAS. o Furnish and install low voltage wiring modifications as needed to all controller locations. o Furnish and install new hot water supply and hot water return temperature sensors. o Any other requirements as noted in the Attachments to provide a new DDC Building Automation System. o Recommendations for any sequence of operations adjustments to maximize efficiency of the existing HVAC systems. o Installation shall be turnkey, with all requirements provided by this Contractor. Provide any electrical or low voltage requirements for any new controllers or equipment. o Provide Operation & Maintenance (O&M) Manuals with all applicable equipment, sequences, devices, warranty information, and control diagrams for the Owner's reference.
Post-Bid
Library
$400,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 4, 2026
June 3, 2026
210 Main St, Pewaukee, WI
Related To This Project
Pewaukee, WI
Bid Date: Apr 30 2026
Pewaukee, WI
Bid Date: May 27 2026
Pewaukee, WI
Bid Date: May 26 2026
Pewaukee, WI
Bid Date: May 12 2026
Pewaukee, WI
Bid Date: May 26 2026
Pewaukee, WI
Bid Date: May 25 2026
Pewaukee, WI
Bid Date: May 12 2026
Pewaukee, WI
Bid Date: May 28 2026
Pewaukee, WI
Bid Date: Apr 07 2026
Pewaukee, WI
Bid Date: Sep 16 2021
Pewaukee, WI
--
Pewaukee, WI
Bid Date: Mar 09 2026
Pewaukee, WI
Bid Date: Mar 09 2026
Pewaukee, WI
Bid Date: Mar 03 2026
Pewaukee, WI
Bid Date: Mar 03 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
