BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2026 at 8:00 PM

Updated May 20, 2026

Site work and new construction of a playground / park / athletic field in Tangent, Oregon. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Question Deadline 04/21/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. 1. Basic Bid - Only one schedule will be selected by the Owner. A. Schedule A - Park Pavilion with Steel Construction 1. Park Pavilion with Steel Construction comprises construction of a new 40x60x10 park pavilion with new concrete slab. Steel construction with stained cedar wrapped columns for heavy timber aesthetic, concrete footings, T3 standing seam metal roof, and electric lighting and power outlets. B. Schedule B - New Park Pavilion with Timber Construction 1. Construction of a New Park Pavilion with Timber Construction includes a 40x60x10 park pavilion with new concrete slab. Timber construction with stained cedar wrapped columns for heavy timber aesthetic, concrete footings, T3 standing seam metal roof, and electric lighting and power outlets. Only one schedule will be selected by the Owner. C. Sitework for Both Schedules 1. Sitework for both schedules includes: expanded parking lot including widened driveway approach, culvert extension, and interior sidewalk with valley gutter; water service line extension from existing site plumbing; and upgrade an existing electrical circuit from City Hall main panel to provide service to the pavilion via a new subpanel. Estimated construction cost for the Basic Bid is for either schedule is between $260,000 and $290,000. Only one schedule will be selected by the Owner. Schedule A includes construction of a new 40x60x10 park pavilion with a new concrete slab, steel construction with stained cedar wrapped columns for a heavy timber aesthetic, concrete footings, T3 standing seam metal roof, and electric lighting and power outlets. Schedule B includes construction of a new 40x60x10 park pavilion with a new concrete slab, timber construction with stained cedar wrapped columns for a heavy timber aesthetic, concrete footings, T3 standing seam metal roof, and electric lighting and power outlets. Sitework for both schedules includes expanded parking lot with widened driveway approach, culvert extension, interior sidewalk with valley gutter, water service line extension from existing site plumbing, and upgrade of the existing electrical circuit from City Hall main panel to provide service to the pavilion via a new subpanel. Pre-qualification: Required A Pre-Bid Conference will not be held. Bid Result Schedule A – RA Gray Construction, LLC $346,678. Schedule B – RA Gray Construction, LLC $336,677

Bid Results

Playgrounds / Parks / Athletic Fields

$683,355.00

Public - City

New Construction, Site Work

17

36

8

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
106
Bidding Soon
1,119
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2026

May 28, 2026

Project location map

To Be Determined, Tangent, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.