BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a bridge / tunnel in Hobart, Indiana. Completed plans call for site work for a bridge / tunnel.

The scope of work includes two projects on County Line Road north of 10th Street. Project #1 involves the replacement of an existing 15" corrugated metal pipe (CMP) culvert with a 15" reinforced concrete (RC) pipe, installation of a storm manhole, end sections with rip rap, aggregate shoulder, a multi-layered erosion control mat, site grading, HMA patching, and bank stabilization. It also includes removals such as site clearing, grubbing, existing culvert removal, common excavation, pavement removal, and restoration of banks and disturbed areas to their original or better condition. Project #2 consists of site improvements around an existing 96" CMP culvert by grading the bank and installing a multi-layered erosion control system, with removals limited to site clearing, grubbing, and grading. The existing culvert remains intact. Installation includes site grading, aggregate shoulder, and erosion control mat along the embankments, along with restoration of banks and disturbed sites to existing or better conditions. Instructions to bidders include submitting two copies of the bid package, accompanied by a certified or cashier's check or acceptable bid bond in an amount not less than ten percent of the total bid. This serves as a guarantee for contract entry and performance security if the bid is accepted. Bids may be withdrawn prior to opening but not for sixty days after opening unless agreed to by the owner. The owner determines the lowest, responsive, responsible bidder based on the bid and other relevant contract matters. The owner reserves the right to waive informalities, accept the lowest responsive and responsible bid, or reject any and all bids. Further requirements regarding bid submittal, qualifications, procedures, and contract award are provided in the instructions to bidders included in the bidding documents. Question Deadline 04/16/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: All inquiries shall be directed to Abonmarche, attn. Jacob Manzo, Assistant Project Engineer at 219-850-4624, or via email: jmanzo@abonmarche.com. Technical questions submitted via email shall be entitled "County Line Road Culvert Replacement- Technical question. " Questions received less than seven days pri

Post-Bid

Bridges / Tunnels

$200,000.00

Public - City

Site Work

10

9

2

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
515
Active Projects
225
Bidding Soon
2,996
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2026

May 28, 2026

Project location map

County Line Rd, Hobart, IN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.