BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Site work, paving and new construction of a mixed-use development in Maricopa, Arizona. Completed plans call for the construction of a playground / park / athletic field; and clubhouse / community center.

The City of Maricopa is seeking a firm to provide Construction Manager at Risk (CM@R) Services for the Civic Center Iconic Park CIP project, located on a 58 acre city owned parcel adjacent to Maricopa Civic Center (39700 West Civic Center Plaza, Maricopa AZ 85138). The project will include an inclusive destination playground, a 3.5-acre lake for irrigation with pump enclosure, a fishing dock, a destination recirculated splash pad, an amphitheater with a 5.1-acre great lawn, pump track, GFRC themed boulder entry zone, pickleball courts, basketball courts, sand volleyball courts, dog park, maintenance yard, water harvesting landscape features, picnic areas, parking areas, hard surface and soft-surface pedestrian paths, interpretive art elements, food truck zone, and coordination for future retail pads. Architectural features include, but are not limited to: a major integrated shade structure over the destination playground, large-group ramadas, medium-group ramadas, standard-sized ramadas, community center with event space, custom shade structures, and zip-line elements. The large-scale shade structure over the destination playground may feature video-board integrated technology. Civil infrastructure includes, but is not limited to: large scale earthwork, grading, drainage and stormwater conveyance systems, bridge over West Bowlin Road, underground utilities (including wet and dry utilities), internal roadways, parking facilities, pedestrian circulation networks, and lake infrastructure. The civil work includes construction of integrated arroyos, detention and retention features, water harvesting systems, lake area, and specialty paving. Early CMAR involvement is essential to address constructibility, value engineering, sequencing/phasing, and cost modeling associated with the project's scale, phased implementation, and integration of architectural, civil, electrical, landscape, irrigation, utilities, and structural elements.

GC Bidding

Playgrounds / Parks / Athletic Fields

$50,000,000.00

Public - City

New Construction, Paving, Site Work

4

3

2

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
58
Bidding Soon
881
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2026

July 27, 2026

Project location map

39700 W. Civic Center Plaza, Maricopa, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.