BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a civil project in Niles, Michigan. Completed plans call for site work for a water / sewer project.

All questions shall be directed to Frank Renaldi by 5pm, Friday, May 1, 2026. For the construction of the Grinder Pump Station and Force Main Installation Project. The work for which bids are being requested consists of the following: Contract : Installation of a duplex grinder station, 960LF HDPE force main by directional drill, electrical panel for flow meter and grinder station controller and various appurtenances. A certified check or bank draft drawn on a solvent bank in the State of Michigan payable without condition to the OWNER or a satisfactory bid bond executed by the bidder and a surety company, in an amount equal to 5 percent of the bid shall be submitted with each bid. No bids may be withdrawn after the scheduled closing time for receipt of bids for at least ninety (90) days. For any project questions please contact Frank Renaldi at frenaldi@gowightman.com. The successful bidder will be required to furnish a satisfactory Performance Bond and a Labor and Material Bond in the amount of 100 percent of the Contract price. Bond forms are included in the Contract Documents. The OWNER reserves the right to reject any or all bids and to waive any irregularities in bidding. The use of local contractors and labor is encouraged. If any person contemplating submitting a bid for this Contract is in doubt as to the true meaning of any part of the plans, specifications, or other proposed Contract Documents, he may submit to the OWNER a written request for an interpretation thereof. Project Description: The project consists of placing 960 2-inch HDPE force main by directional drilling and a pre-fabricated grinder station and electrical connections. Notable items in the work include: 1. Directional Drill across RV Park land, in an easement across the old railroad grade and across M-139 to the connection point. 2. Installation of a metering chamber, 3. Connection to a township manhole on the west side of M-139, and 4. Electrical connections to all appurtenances.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

5

17

12

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
96
Bidding Soon
1,425
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

June 4, 2026

Project location map

1701 Pucker St Dr, Niles, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.