BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of a municipal facility in Durango, Colorado. Completed plans call for the renovation of a municipal facility.

Reference Number 0000421119 La Plata County is seeking bids from qualified contractors to replace two (2) horizontally mounted commercial boilers at the La Plata County Human Services Building with three (3) new upright/vertical boilers. Demolition/Sizing/Removal The existing two (2) boilers are Lochinvar copper-fin II. The units are stacked with the use of 2- inch square tube frames. Measurements are 34" wide x 35 1/2 " high x 7' 9" long. Due to the size of the boiler room, the boilers will need to be disassembled and sized for removal from their locations. The only access to the room is a 35" x 83 1/2 " door. See photos (published separately with RFP) Demolition includes removal of existing boilers, pumps, piping, controls and all accessories. Disconnect gas piping back to the 4-inch main entering the room. Remove circulation pumps, controls, hydronic piping, valves, sensors, gauges, air separator, expansion tank and bypass feeder up to penetrations through walls and ceiling. Remove existing boiler flues and air ducts, patch roof and walls as required. Replace existing boiler control panel. See drawings; published separately with the RFP. Installation to include three (3) new Lochinvar FTX1000 commercial boilers per 2024 IEC code. Install new inline and base mounted pumps, new expansion tank, new boiler control panel connected to existing BAS, as well as new 6" exhaust and combustion air ducts, all plumbing, gas and exhaust connections per current code, and patch roofs and walls as required. See drawings; published separately with the RFP. Note: Use of a specific brand name and model has been approved for this solicitation due to the Engineer's prior design work, which is responsive to physical space limitations for the work. The Project has been designed by ME&E Engineering (Engineer). ME&E will act as Owner's representative for project oversight. They will assume all duties and responsibilities, and have the rights and authority assigned to the Engineer, including but not limited to review and approval of all materials/equipment/machinery to be used on the project. Question Deadline 05/13/2026 at 5:00 PM MT Questions are submitted online No

Sub-Bidding

Municipal

$80,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2026

June 19, 2026

Project location map

10 Burnett Ct, Durango, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.