Published April 21, 2026 at 8:00 PM

Updated May 21, 2026

Demolition and remodeling of an educational facility in Caledonia, Michigan. Completed plans call for the remodel of a educational facility.

This is a Design through Build completion project creating a separation of a former stage area from the gym at the Kraft Meadows Intermediate School. Contractor is to provide a Design through Build completion project creating a separation of a former stage area from the gym. All submittals and permits are the responsibility of the awarded contractor. Work to be completed after June 16th and be complete as soon as possible as not to push into the school year. All questions can be addressed to Matthew Hess, Executive Director of Operations and Transportation at 616.891.0225 x3 or HessM@CalSchools.org. 1. Contractor is to provide a Design through Build completion project creating a separation of a former stage area from the gym. a. Demolition and disposal of any structures in the work field b. 6" metal stud wall with (2) layers of impact resistant gypsum, from between the existing proscenium jambs extending tight to the roof (to avoid adding a ceiling in the storage room). c. On gym side FRP paneling to 8 ft.and painted above 8 ft. with Sherwin Williams water based epoxy paint - color TBD. d. 6' set of 45 minute rated double doors with a frame and no mullion. Inclusive of appropriate hardware - District will provide a Medeco core for lock. 2. Project should meet all existing code compliance requirements. 3. All submittals and permits are the responsibility of the awarded contractor 4. Contractor is to effect cleanup at all sites at the end of each day / project area. 5. Work to be completed after June 16th and be complete as soon as possible as not to push into the school year. 6. Contractor shall be responsible for all repairs or damages to School District property caused by his/her equipment, personnel or materials used. 7. Invoicing will be done only on work that has been performed.

Post-Bid

Educational

$1,500,000.00

Public - City

Demolition, Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
101
Bidding Soon
1,504
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2026

July 19, 2026

Project location map

9230 Kraft Ave SE, Caledonia, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.