Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 21, 2026 at 8:00 PM
Updated May 21, 2026
Demolition and remodeling of an educational facility in Caledonia, Michigan. Completed plans call for the remodel of a educational facility.
This is a Design through Build completion project creating a separation of a former stage area from the gym at the Kraft Meadows Intermediate School. Contractor is to provide a Design through Build completion project creating a separation of a former stage area from the gym. All submittals and permits are the responsibility of the awarded contractor. Work to be completed after June 16th and be complete as soon as possible as not to push into the school year. All questions can be addressed to Matthew Hess, Executive Director of Operations and Transportation at 616.891.0225 x3 or HessM@CalSchools.org. 1. Contractor is to provide a Design through Build completion project creating a separation of a former stage area from the gym. a. Demolition and disposal of any structures in the work field b. 6" metal stud wall with (2) layers of impact resistant gypsum, from between the existing proscenium jambs extending tight to the roof (to avoid adding a ceiling in the storage room). c. On gym side FRP paneling to 8 ft.and painted above 8 ft. with Sherwin Williams water based epoxy paint - color TBD. d. 6' set of 45 minute rated double doors with a frame and no mullion. Inclusive of appropriate hardware - District will provide a Medeco core for lock. 2. Project should meet all existing code compliance requirements. 3. All submittals and permits are the responsibility of the awarded contractor 4. Contractor is to effect cleanup at all sites at the end of each day / project area. 5. Work to be completed after June 16th and be complete as soon as possible as not to push into the school year. 6. Contractor shall be responsible for all repairs or damages to School District property caused by his/her equipment, personnel or materials used. 7. Invoicing will be done only on work that has been performed.
Post-Bid
Educational
$1,500,000.00
Public - City
Demolition, Remodeling
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2026
July 19, 2026
9230 Kraft Ave SE, Caledonia, MI
Related To This Project
Caledonia, MI
Bid Date: Jun 09 2026
Caledonia, MI
--
Caledonia, MI
Bid Date: Apr 13 2026
Caledonia, MI
--
Caledonia, MI
--
Caledonia, MI
Bid Date: Mar 30 2026
Caledonia, MI
Bid Date: Mar 03 2026
Caledonia, MI
Bid Date: Feb 17 2026
Caledonia, MI
Bid Date: Jan 22 2026
Caledonia, MI
Bid Date: Dec 16 2025
Caledonia, MI
Bid Date: Nov 19 2025
Caledonia, MI
Bid Date: Nov 19 2025
Caledonia, MI
Bid Date: Nov 12 2025
Caledonia, MI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.