BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 23, 2026 at 8:00 PM

Updated May 24, 2026

Demolition, site work, paving and new construction of a mixed-use development in Old Town, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Description: The Improvements under this Contract consist of milling & resurfacing, base work, shoulder treatment, drainage improvements, curb & gutter, highway signing, guardrail, bridges, precast concrete bent caps, and other incidental construction on CR 357 in Dixie County. Total Roadway Length: 0.287 Miles Contract Days: 540 Total Bridge Length: 0.079 Miles Total Proposal Length: 0.366 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Days Project No. 437402-1 Question Deadline 05/13/2026 at 5:00 PM ET, Direct all questions to the Department by posting them to the Department's website. Questions posted to this site before 5:00 P.M. (EST) on the tenth calendar day prior to the bid opening, will be responded to by the Department. For questions posted after this deadline, an answer cannot be assured. FDOT - 006 - Bridge Replacement - CR 357

Post-Bid

Bridges / Tunnels

$9,846,237.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

10

4

6

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
54
Bidding Soon
832
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2026

July 20, 2026

Project location map

Hines Tram Rd, Old Town, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.