BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a road / highway in Holland, Wisconsin. Completed plans call for site work for a road / highway.

The work consists of resurfacing approximately 57 miles of Green Place, which is part of the Green Oaks Mobile Home Park. The Town of Holland is accepting lump sum bids for this project. Bidders must provide a certificate of Liability and Work-man's Compensation insurance. The completion date is to be negotiated at the time of contract but must be completed by October 31, 2026. Soil boring information is available upon request. The Town Board reserves the right to reject any or all bids. Road work shall include salvage topsoil excavate 6" depth , construct 6" of 1 1/4 " base course , 3" asphaltic surface (credit provided where excavating not required and existing pavement structure allows for pulverize /relay / asphalt treatment ) 2 ' of 3/4" base course shoulders re-gravel and re- seed/landscape any disturbed road edges match existing pavement width all incidental work including but not limited to sawcuts , butt joints , driveway matches , and traffic control maintain access to all driveway at all times unless approved by property owner and Town of Holland

Post-Bid

Roads / Highways

$9,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
46
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2026

July 13, 2026

Project location map

Green Pl, Holland, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.