BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 15, 2026

Renovation of a municipal facility in Saint Charles, Missouri. Completed plans call for the renovation of a municipal facility.

The City of St. Charles, Missouri is seeking bids from qualified HVAC Contractors to replace failed mechanical equipment serving the Fleet Supervisor Office, Break Room, and the Rest Rooms at the Public Works Facility (PWF) Fleet Garage. The contractor shall provide all labor, supervision, materials, tools, and equipment to complete the work. Project duration is eight weeks from Notice to Proceed. Deadline for clarifying questions: May 4, 2026 3:00 PM Any questions related to the IFB shall be submitted to Paul Feldmann, Purchasing Manager, at paul.feldmann@stcharlescitymo.gov SPECIFICATIONS The contractor shall provide all labor, supervision, materials, tools, and equipment required to complete the following: 1. Remove and legally dispose of the existing Energy Recovery Unit (ERU) and nonoperational condensing unit. 2. Furnish and install one (1) single-stage, 2-ton heat pump condensing unit matched to a new Fan Coil Unit (FCU). 3. Remove existing FCU and install one (1) replacement FCU configured to draw outside air via the existing ERU ductwork connection. 4. Furnish and install one (1) exhaust fan utilizing existing ERU exhaust ductwork, including disconnects, controls, and vibration isolation. 5. Provide all required duct transitions, grilles, filters, insulation, supports, and condensate drains to integrate new equipment with existing duct systems. 6. Provide controls, including thermostat(s) and interlocks between the heat pump system and exhaust fan. 7. Perform refrigerant evacuation and charging, leak testing, system startup, commissioning, air balancing, and provide one (1) day of operator training. 8. Provide project deliverables including: - As-built drawings (PDF format) - Startup and commissioning reports - Air balancing report - Operation and Maintenance (O&M) manuals - Warranty documentation C. EQUIPMENT REQUIREMENTS o One (1) single-stage, 2-ton heat pump condensing unit o One (1) Electric Direct Drive Exhaust Fan o One (1) matched Fan Coil Unit (FCU) o All equipment shall be new, energy-efficient, and compliant with applicable codes and manufacturer specifications. D. PROJECT TIMELINE o Project Duration: 8 Weeks from Notice to Proceed o Contractor shall provide a detailed schedule upon award

Bid Results

Municipal

$18,395.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2026

July 6, 2026

Project location map

2871 Elm Point Industrial Dr, Saint Charles, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.