Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 13, 2026 at 8:00 PM
Updated May 15, 2026
Renovation of a municipal facility in Saint Charles, Missouri. Completed plans call for the renovation of a municipal facility.
The City of St. Charles, Missouri is seeking bids from qualified HVAC Contractors to replace failed mechanical equipment serving the Fleet Supervisor Office, Break Room, and the Rest Rooms at the Public Works Facility (PWF) Fleet Garage. The contractor shall provide all labor, supervision, materials, tools, and equipment to complete the work. Project duration is eight weeks from Notice to Proceed. Deadline for clarifying questions: May 4, 2026 3:00 PM Any questions related to the IFB shall be submitted to Paul Feldmann, Purchasing Manager, at paul.feldmann@stcharlescitymo.gov SPECIFICATIONS The contractor shall provide all labor, supervision, materials, tools, and equipment required to complete the following: 1. Remove and legally dispose of the existing Energy Recovery Unit (ERU) and nonoperational condensing unit. 2. Furnish and install one (1) single-stage, 2-ton heat pump condensing unit matched to a new Fan Coil Unit (FCU). 3. Remove existing FCU and install one (1) replacement FCU configured to draw outside air via the existing ERU ductwork connection. 4. Furnish and install one (1) exhaust fan utilizing existing ERU exhaust ductwork, including disconnects, controls, and vibration isolation. 5. Provide all required duct transitions, grilles, filters, insulation, supports, and condensate drains to integrate new equipment with existing duct systems. 6. Provide controls, including thermostat(s) and interlocks between the heat pump system and exhaust fan. 7. Perform refrigerant evacuation and charging, leak testing, system startup, commissioning, air balancing, and provide one (1) day of operator training. 8. Provide project deliverables including: - As-built drawings (PDF format) - Startup and commissioning reports - Air balancing report - Operation and Maintenance (O&M) manuals - Warranty documentation C. EQUIPMENT REQUIREMENTS o One (1) single-stage, 2-ton heat pump condensing unit o One (1) Electric Direct Drive Exhaust Fan o One (1) matched Fan Coil Unit (FCU) o All equipment shall be new, energy-efficient, and compliant with applicable codes and manufacturer specifications. D. PROJECT TIMELINE o Project Duration: 8 Weeks from Notice to Proceed o Contractor shall provide a detailed schedule upon award
Bid Results
Municipal
$18,395.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
