BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a playground / park / athletic field in Modesto, California. Completed plans call for site work for a playground / park / athletic field.

The Park Turf Reduction, Phase 3 project involves the removal of turf grass and installation of landscape irrigation and drought tolerant landscape plant materials in various City of Modesto parks. The project is a public works project requiring bidders to be registered with the Department of Industrial Relations. The estimated base bid value is $999,725, with additional bid alternatives detailed in the instructions. The project duration is 40 working days with liquidated damages set at $1,000 per day. License requirements include holding a Class "A," "B," and/or "C-27" California State Contractor License. Payment of prevailing wages is required. Question Deadline 05/05/2026 at 4:00 PM PT Email all questions to Park_Turf_Reduction_Phase_3_Bid_Questions@docs.e-builder.net no later than 5 business days prior to the bid opening. Instructions to bidders include: - Each bid must be made on the Bid Form available through the OpenGov Procurement Portal and be accompanied by a bid security for not less than 10 percent of the bid amount. - Each bid must also include executed Local Hire Certification and Skilled and Trained Workforce Certification. - Bid security can be provided via electronic bid bond through Surety2000, certified check, cashier's check, cash, or an original, notarized hard-copy bid bond on the city's form. - Only one bid package will be accepted for each bidder, and all required bid forms must be reviewed, completed, signed, and uploaded. - Bidders are fully responsible for ensuring their bid security is received by the City Clerk before the bid opening. Failure to provide required bid security will result in the bid being deemed non-responsive. - Bids will be accepted electronically until the specified date and time. Bidders cannot withdraw their bid for 90 days after opening. The City reserves the right to reject any or all bids or waive informalities or minor irregularities. - The payment bond and performance bond requirements are each 100% of the contract value. - All bidders must review the provided plans and specifications.

Bid Results

Playgrounds / Parks / Athletic Fields

$926,680.00

Public - City

Site Work

77

16

2

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
426
Active Projects
190
Bidding Soon
2,225
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2026

June 1, 2026

Project location map

Multiple Locations, Modesto, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.