BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 16, 2026

Site work, paving and renovation of a transportation facility in Camarillo, California. Completed plans call for the renovation of a transportation facility; for site work for a transportation facility; and for paving for a transportation facility.

Runway 8-26 Rehabilitation - Camarillo Airport, Specification No. DOA 26-02, which consists of partial depth pavement removal of the runway asphalt surface by cold milling (3" approximate depth), asphalt crack repair, placement of an asphalt surface course (PG 70-10) (3" approximate thickness), tack coat, fog sealing with sand, installation of multiple colors of pavement markings, grooving of the runway pavement surface, removal of elevated runway edge light fixtures, removal of elevated runway threshold light fixtures, installation of elevated runway edge light fixtures on existing bases, installation of elevated runway threshold fixtures on existing bases, mobilization, airfield safety and traffic control, construction staking and survey layout, airport access road and haul route repair, and compliance with pollution, erosion, and siltation control. Question Deadline 04/29/2026 at 5:00 PM PT All questions concerning the plans, specifications, requirements, terms, schedule, addenda, and any other matters related to this solicitation shall be submitted through the Ventura County Bonfire procurement website. The County will not respond to questions submitted by email, telephone, or other methods outside of the Bonfire website. Prebid meeting : Apr 22nd 2026, 10:00 AM PDT - Apr 22nd 2026, 12:00 PM PDT The estimated cost of construction is: Schedule I - $15,000,000 Bid Alternate Schedule II - $355,000 The work involved will include the following: Schedule I - Runway 8-26 Pavement Rehabilitation Bid Alternate Schedule II - Runway 8-26 Lighting Rehabilitation

Award

Transportation Terminals

$8,913,868.00

Public - County

Paving, Renovation, Site Work

134

18

10

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
393
Active Projects
169
Bidding Soon
2,031
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2026

June 20, 2026

Project location map

555 Airport Way, Camarillo, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.