BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a road / highway in Hillsboro, Montana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work consists of relocating a section of Sulphur Springs Road out of the 100-year floodplain, with an approximate length of 800 feet. The project includes new 12' lanes that consist of 4" base rock, 8" of bituminous asphalt base, and 2" asphalt wearing surface. Work must be performed according to the provided Specifications, Job Special Provisions, and Plans, and, when not specifically covered, according to the currently effective 2025 Edition of the "Missouri Standard Specifications for Highway Construction," and the currently effective "MoDOT Standard Plans for Highway Construction." Bids must be submitted in triplicate in an opaque sealed envelope marked with the Project title, name and address of the Bidder, and be accompanied by the other required documents. Bids submitted electronically will be rejected. Late bids will not be accepted. All bidders must attend a Pre-Bid Meeting to be held at the Jefferson County Annex. Only bidders in attendance will have their bids considered. Bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2025 Edition, with the contractor questionnaire on file 7 days prior to bid opening. All labor used must be paid no less than the prevailing hourly rate of wages as established by the State of Missouri's Annual Wage Order. All bids require a cashier's check or bid bond in the amount of 5% and a certificate of insurance. Bids must be made on the provided forms, with three copies submitted (one original inked). Contractors and subcontractors must provide a minimum 10-Hour OSHA construction safety program to on-site employees within sixty days of beginning work. Jefferson County reserves the right to reject any or all bids or waive any informality in the bids received, and to award the contract to the lowest, responsive, responsible bidder. Jefferson County Public Works will be realigning a portion ofSulphur Springs from the quarry entrance to Hwy 61/67, All questions concerning this project during the bidding process shall be forwarded to the project contact listed below. Rebecca Dawson, Civil Project Manager I Jefferson County Public Works PO Box 100 Hillsboro, MO 63050 Telephone Number: 636-797-5479 Email: RDawson@jeffcomo.org

GC Bidding

Roads / Highways

$958,411.00

Public - County

Paving, Site Work

25

7

2

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
11
Bidding Soon
119
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2026

June 18, 2026

Project location map

HWY 61/67, Hillsboro, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.