BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in Millcreek, Utah. Completed plans call for site work for a water / sewer project.

The work consists of video inspection, cleaning, and CIPP rehabilitation of approximately 9,100 linear feet of 8-inch sewer main, 568 linear feet of 10-inch sewer main, reinstating approximately 180 services, bypass pumping, permits, and traffic control. All work is located within the District's service area. All work covered by the contract documents shall be completed by October 31, 2026. Each bid shall be accompanied by a certified check, cashier's check, or bid bond in the amount of five percent (5%) of the total bid price as a guarantee that the bidder, if their bid is accepted, will promptly execute the contract, secure payment of worker's compensation insurance, and furnish a satisfactory, faithful performance bond in the amount of one hundred percent (100%) of the contract price and a payment bond in the amount of one hundred percent (100%) of the contract price. Any contractor who has not worked in the District within the last 5 years may be required to submit additional documentation, including experience and references for at least three projects of similar scope and size completed within the last 5 years. The work will be awarded based on experience, references, availability, and cost. A waiting period of 30 calendar days from the date of opening of bids to award of contract may be required. The Owner reserves the right to reject any or all bids, to waive an informality in a bid, and to make awards in the interest of the Owner. No specification interpretations will be made by telephone, nor will any 'or equal' products be considered for approval prior to award of contract. Question Deadline 05/11/2026 Submit to the Engineer a written request for an interpretation or correction thereof and to be given consideration, shall be received at least five (5) days prior to date fixed for opening proposals.

Sub-Bidding

Water / Sewer

$632,920.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
91
Bidding Soon
979
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2026

June 17, 2026

Project location map

Multiple Locations, Millcreek, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.