BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a sidewalk / parking lot in Bayside, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Question Deadline 05/01/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to the ENGINEER in writing Questions received less than 10 days before the date for Opening of Bids may not be answered The work includes the installation of new sidewalk along the east side of Port Washington Rd from W Glencoe Pl to W Fairy Chasm Rd. The project involves landscaping with tree and shrub clearing, construction of sidewalks, curbs, and gutters, installation of ADA curb ramps, and pavement marking. Bidders are to submit sealed bids for the outlined work. B. Description of Work: Approximately 9615 SF of new concrete sidewalk, 430 SY of concrete driveway removal and replacement, and restoration along the east side of N Port Washington Rd between W Glencoe Pl and W Fairy Chasm Rd. 1.03 COMPLETION DATES Final Completion: Set forth in the Agreement, and Supplementary Conditions. 1.04 LIQUIDATED DAMAGES Provisions for liquidated damages, if any, are set forth in the Agreement, and in the Supplementary Conditions. 1.05 WORK RESTRICTIONS Use of Project Site: A. Location of construction facilities, staging areas, product stockpiles, material storage, and temporary construction shall be removed upon completion of the Work. B. Contractor will be responsible for damages to adjacent roadways. C. Keep existing driveways and entrances clear and available to the public and to the Owner. D. If additional space is needed, obtain and pay for such space off Project Site. E. In Bayside, all operations shall be conducted only between the hours of 7:00 AM and 5:00 PM. No operations shall be conducted on Saturdays, Sundays or holidays. F. not used. G. Due to the residential nature of the work site and its close proximity to homes with children, the Village is requesting that the contractor's crew conduct themselves accordingly. The contractor shall control the use of profane language, provide and ensure the crew uses an approved toilet facility and refrain from the consumption of alcohol on the job site.

Post-Bid

Sidewalks / Parking Lot

$100,000.00

Public - City

Paving, Site Work

13

11

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
336
Active Projects
172
Bidding Soon
1,921
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2026

June 11, 2026

Project location map

N Port Washington Rd, Bayside, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.