Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 30, 2026 at 8:00 PM
Updated May 15, 2026
Site work and paving for a road / highway in West Chester, Pennsylvania. Completed plans call for site work for a road / highway.
The contract generally involves the labor, materials, services, and equipment necessary for pavement milling, base course repair, and pavement resurfacing on segments of College Hill Dr., William Penn Blvd., Greentree Dr., and South New Street. Sealed bids are to be addressed to Thornbury Township, 800 E Street Rd, West Chester, PA 19832. Hand delivered bids shall be delivered to the mailbox during normal business hours of 8 AM to 3 PM, Mon to Thurs. No bids shall be accepted after 1 PM, May 14, 2026. Bids shall be opened at the Township building shortly after 1 PM, May 14, 2026. The bid package is available via email or hardcopy at the Township Building for $35.00 each, non-refundable. Bid bond or certified check in the amount of ten percent (10%) of the bid amount is required. All bidders are required to attend a mandatory pre-bid meeting on May 7, 2026 at 9 AM at the Township Building. PA prevailing wage rates apply. PA Act 127 (Public Works Verification Act) requirements apply. The selected bidder will be required to furnish a Performance Bond, Payment Bond, and Workman Comp Insurance Certification. Contract time is 60 calendar days from Issuance of the Notice to Proceed. Thornbury Township reserves the right to reject any and all bids or parts thereof and make awards in any manner deemed to be in the project's best interest. Questions shall be directed to Michael Conrad, PE, Yerkes Associates, Inc. (610-644-4254). LOCATION OF WORK: College Hill Drive Road length ofapproximately 1,980 linear feet between the Cheyney Road and Creek Road intersections - Pavement milling, base course repairs, pavement resurfacing and speed hump markings on College Hill Drive. LOCATION OF WORK: Greentree Drive - Road segment length of approximately 1,135 linear feet from #246 Greentree Drive to the Red Lion Road eastern intersection. Pavement milling, base course repairs, and pavement resurfacing on Greentree Drive. LOCATION OF WORK: South New Street - Road segment length of approximately 626 linear feet extending from the area of 1295 S. New Street to just beyond the Militia Hill Drive intersection. Pavement milling, base course repairs, pavement resurfacing and lane striping on South New Street. LOCATION OF WORK: William Penn Boulevard -Road length ofapproximately 1,665 feet extending north from the William Penn Boulevard intersection with Penn Oaks Drive on Wiliam Penn Boulevard. Pavement milling, base course repairs, pavement resurfacing and lane striping on William Penn Boulevard.
Post-Bid
Roads / Highways
$1,000,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2026
June 15, 2026
Multiple Locations, West Chester, PA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
