BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a museum in Olean, New York. Completed plans call for the renovation of a museum.

Full removal and replacement of the existing Bartlett House roof. The work shall consist of , but not be limited to, the following general items . This scope of work is not intended to list every individual task that must be completed, nor every item that must be updated , to complete a full replacementof the roof . It is the City's intention to rely upon the expertiseof the bidders to ensure that the work completed results in the Bartlett House being fitted with a new roof that is up to date with the currentstandardsof practice in the industry . To present their bid in the most competitive light bidders are welcome , though not required , to submit with their bid an expanded scope of work statement that describes in greater detail the work they intend to complete under their bid . The City will carefully consider all materials submitted in a bidder's submission . removal of the existing roof . Remove all roof system components down to the roof sheeting, including but not limited to: shingles , low slope /flat roof system components , underlayment , drip edge , flashings . Remove all debris from the site and dispose of properly . Repair roof sheeting as necessary. - There are no known defects in the roof sheeting that will require repair . Provide a new roof system that will provide the City a minimum of a 30 year manufacturer's warranty on the materials utilized . All componentsof the roof systemshall be consistentwith the manufacturer's warranty requirements . Shingled portion : The shingles shall be CertainTeed Landmark Designer Shingles in Burnt Sienna , GAF Timberline AS II shingles in Hickory , or approved equal . The provided roof system shall include, but is not limited to, the following : o o o Aluminum drip edge Self -sealing ice and water shield , 6 feet wide at both eaves and valleys , Water -resistant synthetic underlayment designed for installation beneath asphalt shingles Architectural asphalt shingles Aluminum flashings , including fully flashed valleys , Continuous ridge vents on the ridge and hips . Low slope /flat roof portion The roof membrane shall be a 0.060 inch EPDM membrane . The roof shall be installed as a fully adhered system . Provide 1/2 " high density ISO recovery board under all low slope/flat roof areas. Repair or amend roof deck insulation as needed to provide positive drainage on all low slope /flat roof areas . " Provide all new aluminum drip edge and fascias Question Deadline 05/14/2026 Please direct any questions to the DPW at DPWadmins@cityofolean.org .

Sub-Bidding

Museum

$50,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
328
Active Projects
184
Bidding Soon
1,934
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2026

June 22, 2026

Project location map

302 Laurens St, Olean, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.