BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 11, 2026

Site work for a development in Offutt, Kentucky. Completed plans call for site work for a development.

The Methane Emission Reduction Program (MERP) Project Description: MERP 7 - JOHNSON COUNTY. This package includes reclamation of sites in Johnson County. Vendors are encouraged to submit written questions pursuant to Section 10.9 of this RFP. Written questions shall be submitted to the Commonwealth Buyer via email at kristi.sharp@ky.gov Please reference the RFP number in the Subject Line in your email Question Deadline 05/11/2026 at 4:00 PM ET EASTERN KY-BIG SANDY GAS FIELD (Bell, Boyd, Breathitt, Clay, Floyd, Greenup, Harlan, Jackson, Johnson, Knott, Knox, Laurel, Lawrence, Leslie, Letcher, Magoffin, Martin, McCreary, Owsley, Perry, Pike, Whitley) Wells with TD at 1500' or shallower o Confer with Division Inspector, assure landowner access is approved o Construct access road to well o Dig pit and line with 6 mil liner o Remove brush from location o If tubing & rods remain in well, extract same from the hole and trip out o Any free casing (annulus not cemented) shall be removed. If no records are available to determine Top of Cement (TOC), a bond log may be required, and or perforations o Move In, Rig up and run in well with tools to determine or establish TD o Trip in hole w/tubing to TD o If casing is not cemented or unknown; perforate casing from 600' to 100'; (50' increments) o Circulate Class A, Class L, or Type 1L cement to Surface, plug solid o Cut off all casing 3 ft. below Surface the next day to ensure no fall back has occurred o Monitor cement level and top off as needed o Remove fluids from pit, properly dispose of same, and backfill pit o Properly grade, stabilize, and fully reclaim wellsite as outlined in Scope of Work Wells deeper than 1500' o Confer with Division Inspector, assure landowner access is approved o Construct access road to well o Dig pit and line with 6 mil liner o Remove brush from location, rig-up service rig o If tubing & rods remain in well, extract same from the hole and trip out o Any free casing (annulus not cemented) shall be removed. If no records are available to determine Top of Cement (TOC), a bond log may be required/ and or perforations o Run in well with tools to check/establish TD o Load well with minimum 5 barrels of 6% Gel, not to exceed 25 barrels o Trip in well w/ tubing to TD, Pump 200' Class A or Class L cement plug o Pull up above TOC , wash out, tag bottom plug o Pump fluid 6% gel/water spacer o Spot Class A, Class L, or Type 1L cement plug 50' below deepest perforation to 50' above shallowest perforation (or production zones if open hole), across any and all perforations (or production zones in open hole) not covered by bottom plug o Pump fluid 6% gel/water spacer o If casing is not cemented or unknown; perforate casing from 600' to 100'; (50' increments) o Pump surface plug from Surface Casing shoe (or, if casing shoe depth is unknown or not present, deepest freshwater depth assigned by KYDOG) to surface to isolate coal seams and fresh water zones o Monitor cement level and top off as needed o Cut off all casing 3 ft. below surface the next day to ensure no fall back has occurred o Remove fluids from pit, properly dispose of same, and backfill pit o Properly grade, stabilize, and fully reclaim wellsite as outlined in Scope of Work

Post-Bid

Conservation and Development

$1,000,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
66
Bidding Soon
1,145
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2026

August 10, 2026

Project location map

Multiple Locations, Offutt, KY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.