Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 10, 2026 at 8:00 PM
Updated June 11, 2026
Site work for a development in Offutt, Kentucky. Completed plans call for site work for a development.
The Methane Emission Reduction Program (MERP) Project Description: MERP 7 - JOHNSON COUNTY. This package includes reclamation of sites in Johnson County. Vendors are encouraged to submit written questions pursuant to Section 10.9 of this RFP. Written questions shall be submitted to the Commonwealth Buyer via email at kristi.sharp@ky.gov Please reference the RFP number in the Subject Line in your email Question Deadline 05/11/2026 at 4:00 PM ET EASTERN KY-BIG SANDY GAS FIELD (Bell, Boyd, Breathitt, Clay, Floyd, Greenup, Harlan, Jackson, Johnson, Knott, Knox, Laurel, Lawrence, Leslie, Letcher, Magoffin, Martin, McCreary, Owsley, Perry, Pike, Whitley) Wells with TD at 1500' or shallower o Confer with Division Inspector, assure landowner access is approved o Construct access road to well o Dig pit and line with 6 mil liner o Remove brush from location o If tubing & rods remain in well, extract same from the hole and trip out o Any free casing (annulus not cemented) shall be removed. If no records are available to determine Top of Cement (TOC), a bond log may be required, and or perforations o Move In, Rig up and run in well with tools to determine or establish TD o Trip in hole w/tubing to TD o If casing is not cemented or unknown; perforate casing from 600' to 100'; (50' increments) o Circulate Class A, Class L, or Type 1L cement to Surface, plug solid o Cut off all casing 3 ft. below Surface the next day to ensure no fall back has occurred o Monitor cement level and top off as needed o Remove fluids from pit, properly dispose of same, and backfill pit o Properly grade, stabilize, and fully reclaim wellsite as outlined in Scope of Work Wells deeper than 1500' o Confer with Division Inspector, assure landowner access is approved o Construct access road to well o Dig pit and line with 6 mil liner o Remove brush from location, rig-up service rig o If tubing & rods remain in well, extract same from the hole and trip out o Any free casing (annulus not cemented) shall be removed. If no records are available to determine Top of Cement (TOC), a bond log may be required/ and or perforations o Run in well with tools to check/establish TD o Load well with minimum 5 barrels of 6% Gel, not to exceed 25 barrels o Trip in well w/ tubing to TD, Pump 200' Class A or Class L cement plug o Pull up above TOC , wash out, tag bottom plug o Pump fluid 6% gel/water spacer o Spot Class A, Class L, or Type 1L cement plug 50' below deepest perforation to 50' above shallowest perforation (or production zones if open hole), across any and all perforations (or production zones in open hole) not covered by bottom plug o Pump fluid 6% gel/water spacer o If casing is not cemented or unknown; perforate casing from 600' to 100'; (50' increments) o Pump surface plug from Surface Casing shoe (or, if casing shoe depth is unknown or not present, deepest freshwater depth assigned by KYDOG) to surface to isolate coal seams and fresh water zones o Monitor cement level and top off as needed o Cut off all casing 3 ft. below surface the next day to ensure no fall back has occurred o Remove fluids from pit, properly dispose of same, and backfill pit o Properly grade, stabilize, and fully reclaim wellsite as outlined in Scope of Work
Post-Bid
Conservation and Development
$1,000,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 9, 2026
August 10, 2026
Multiple Locations, Offutt, KY
Related To This Project
Henderson, KY
Bid Date: Jun 09 2026
Hebron, KY
Bid Date: Jul 30 2026
Gulnare, KY
Bid Date: Jun 09 2026
Florence, KY
Bid Date: Apr 30 2026
Murray, KY
Bid Date: Apr 30 2026
Brownsville, KY
Bid Date: Jun 09 2026
Covington, KY
Bid Date: May 21 2026
Lexington, KY
Bid Date: Apr 23 2026
Leitchfield, KY
Bid Date: May 22 2026
Frankfort, KY
Bid Date: Jun 24 2026
Nicholasville, KY
Bid Date: May 01 2026
Louisville, KY
Bid Date: May 01 2026
Lexington, KY
Bid Date: May 01 2026
Frankfort, KY
Bid Date: Jun 09 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
