BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 20, 2026 at 8:00 PM

Updated July 26, 2026

Site work and paving for a mixed-use development in Littleton, Massachusetts. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

*As of May 22, 2026 this project has not yet been awarded. A timeline for award has not yet been established.* King Street Commons Public Infrastructure Project Phase 1.2 Drainage System. The scope of work includes the following items: Construction of a new subsurface infiltration drainage system, drainage structures and piping, earthwork, site grading, tree removal, curb removal and replacement, temporary pavement patching, erosion and sedimentation controls, site restoration, and other incidental work. Each General Bid must be accompanied by a bid security in the amount of 5% of the General Bid. Form of bid security shall either be Cash, Certified Check or a Treasurer's Cashier's Check issued by a responsible bank or trust company, payable to the Town of Littleton or a Bid Bond in accordance with the Bid document. Bidders shall appear on the list of prequalified contractors provided by the Massachusetts Department of Transportation. Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Award is subject to final approval.

Award

Water / Sewer

$419,388.00

Public - City

Paving, Site Work

8

3

3

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
858
Active Projects
304
Bidding Soon
5,376
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2026

June 19, 2026

Project location map

King St, Littleton, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.