Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 8, 2026 at 8:00 PM
Updated June 9, 2026
Site work for a water / sewer project in Corte Madera, California. Completed plans call for site work for a water / sewer project.
Questions Due May 13, 2026 @ 11:00 AM Bidders shall submit questions via email to Jared Cartwright at jared.cartwright@chp.ca.gov. Proposed Start Date of Agreement July 1, 2026 OR Upon DGS Approval, Whichever Is Later California Law Requires Disabled Veterans Business Enterprise (DVBE) participation. All bidders for this solicitation, must meet the minimum DVBE participation requirement of 5%. The term of the resulting agreement is anticipated to be effective from July 1, 2026 to June 30, 2027. Site Walkthrough 05/06/2026 at 11:00 AM PT. Pre-Bid Meeting 04/28/2026 at 11:00 AM PT 350 - Marin 53 San Clemente Dr. Corte Madera, CA. 94925 A. Remove and replace main sewer drain lines at the required slope running under the building's concrete slab including all cleanouts, floor drains, and secondary lines coming from urinals, men's and women's' toilet fixtures, kitchen, and any other lines that tie into the main drain line. B. Contractor shall remove and replace men's and women's shower inserts with like for like shower inserts, if necessary. C. Saw cut and excavate inside the building to expose lines for replacement including cutting and removing sections of slab. D. All excavated areas shall be backfilled, compacted, and finished with concrete to original grade. E. Contractor shall use plastic to cover work areas. F. All dirt shall be contained and covered in rooms where excavation is occurring. G. Check pipe grade to verify conformity with California plumbing code requirements. If grading does not comply with the California plumbing code, Contractor shall regrade as necessary to ensure all new installed pipe meets the required slope allowing wastewater to drain by gravity toward the main sewer. H. If grade cannot be achieved to allow flow through the lateral line to the city, Contractor shall install a sewage ejector/grinder pump including all necessary electrical installation as per local electrical code to lift and push wastewater outside of building. Sewer ejector pump installation location to be verified by the Facilities Coordinator prior to placement. I. Any open trenches shall be covered with suitable material to withstand standing on. J. Contractor shall provide one (1) men's two station VIP restroom with sink plus urinals, one (1) women's 2 station VIP restroom with sink, and one (1) VIP ADA restroom with sink for the length of the project. K. Field verify all measurements encompassed in this project and accept sole responsibility for measurement accuracy. L. Contractor shall repair any damage caused by the Contractor or any of its workers at no expense to the State of California. M. Keep the work site clean and dispose of all debris away from CHP property throughout the entirety of project. N. Maintain a safe working environment to prevent injuries to CHP personnel or damage to CHP property throughout the entirety of project. O. Warranty all parts and workmanship for a period of no less than one (1) year.
Bid Results
Water / Sewer
$252,864.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2026
July 1, 2026
53 San Clemente Dr, Corte Madera, CA
Related To This Project
Corte Madera, CA
Bid Date: May 07 2026
Corte Madera, CA
Bid Date: May 07 2026
Corte Madera, CA
Bid Date: May 04 2026
Corte Madera, CA
Bid Date: Jun 17 2026
Corte Madera, CA
Bid Date: Dec 31 2026
Corte Madera, CA
Bid Date: May 07 2026
Corte Madera, CA
Bid Date: May 12 2026
Corte Madera, CA
Bid Date: May 05 2026
Corte Madera, CA
Bid Date: Apr 20 2026
Corte Madera, CA
Bid Date: Apr 02 2026
Corte Madera, CA
Bid Date: Mar 25 2026
Corte Madera, CA
Bid Date: Mar 12 2026
Corte Madera, CA
--
Corte Madera, CA
Bid Date: Feb 26 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
