BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 8, 2026 at 8:00 PM

Updated June 9, 2026

Site work for a water / sewer project in Corte Madera, California. Completed plans call for site work for a water / sewer project.

Questions Due May 13, 2026 @ 11:00 AM Bidders shall submit questions via email to Jared Cartwright at jared.cartwright@chp.ca.gov. Proposed Start Date of Agreement July 1, 2026 OR Upon DGS Approval, Whichever Is Later California Law Requires Disabled Veterans Business Enterprise (DVBE) participation. All bidders for this solicitation, must meet the minimum DVBE participation requirement of 5%. The term of the resulting agreement is anticipated to be effective from July 1, 2026 to June 30, 2027. Site Walkthrough 05/06/2026 at 11:00 AM PT. Pre-Bid Meeting 04/28/2026 at 11:00 AM PT 350 - Marin 53 San Clemente Dr. Corte Madera, CA. 94925 A. Remove and replace main sewer drain lines at the required slope running under the building's concrete slab including all cleanouts, floor drains, and secondary lines coming from urinals, men's and women's' toilet fixtures, kitchen, and any other lines that tie into the main drain line. B. Contractor shall remove and replace men's and women's shower inserts with like for like shower inserts, if necessary. C. Saw cut and excavate inside the building to expose lines for replacement including cutting and removing sections of slab. D. All excavated areas shall be backfilled, compacted, and finished with concrete to original grade. E. Contractor shall use plastic to cover work areas. F. All dirt shall be contained and covered in rooms where excavation is occurring. G. Check pipe grade to verify conformity with California plumbing code requirements. If grading does not comply with the California plumbing code, Contractor shall regrade as necessary to ensure all new installed pipe meets the required slope allowing wastewater to drain by gravity toward the main sewer. H. If grade cannot be achieved to allow flow through the lateral line to the city, Contractor shall install a sewage ejector/grinder pump including all necessary electrical installation as per local electrical code to lift and push wastewater outside of building. Sewer ejector pump installation location to be verified by the Facilities Coordinator prior to placement. I. Any open trenches shall be covered with suitable material to withstand standing on. J. Contractor shall provide one (1) men's two station VIP restroom with sink plus urinals, one (1) women's 2 station VIP restroom with sink, and one (1) VIP ADA restroom with sink for the length of the project. K. Field verify all measurements encompassed in this project and accept sole responsibility for measurement accuracy. L. Contractor shall repair any damage caused by the Contractor or any of its workers at no expense to the State of California. M. Keep the work site clean and dispose of all debris away from CHP property throughout the entirety of project. N. Maintain a safe working environment to prevent injuries to CHP personnel or damage to CHP property throughout the entirety of project. O. Warranty all parts and workmanship for a period of no less than one (1) year.

Bid Results

Water / Sewer

$252,864.00

Public - State/Provincial

Site Work

4

9

6

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
457
Active Projects
186
Bidding Soon
3,531
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2026

July 1, 2026

Project location map

53 San Clemente Dr, Corte Madera, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.