BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a civil project in Durango, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000422841 Source ID PU.AG.USA.1238.C5751701 Piggyback Contract No Question Deadline 05/15/2026 at 3:00 PM MT Questions are submitted online Yes A: Mobilization and demobilization: This work consists of the mobilization of personnel, equipment, and supplies at the project site in preparation for work on the project. This item shall also include any necessary facilities, utilities, supplies, storage, submittals, permits, bonds, licenses/certifications, and all other costs incurred or labor and operations for which there is no specific pay item, but which must be performed prior to beginning the other items under the Contract. B: Initial Inspection & Planning: Prior to conducting any work, an initial inspection of the structure shall be performed to determine the need for protection against hazardous gases or oxygen-depleted atmosphere and the need for flow control or flow diversion. If required, a plan for flow control or bypass will be submitted to the City for review and approval. C: Surface Preparation: Surface will be prepped to SSPC-SP13/NACE No. 6 standards by methods of abrasive blasting, grinding, or water jetting. Includes removal, transport, and disposal of existing liner and any abrasive materials used. D: Application of Liner: A three (3)-layered lining system comprised of a moisture barrier, surfacer, and final corrosion barrier will be installed using manufacturer specs and recommendations. Total thickness of the multi-layer liner system shall be a minimum of 500 mils. E: Final Inspection: Final liner system shall be completely free of pinholes, voids, and excess liner strands. Any liner applied to non-concrete surfaces, such as pipe inverts, inlets, and outlets, will be removed. The City of Durango Santa Rita Water Reclamation Facility is seeking a company to install proven wastewater liner systems to protect concrete infrastructure from corrosion and infiltration. Participation Requirements - Business Concern - Disadvantaged Business Enterprise (DBE) - Minority Business Participation - Native American Participation - Small Business Participation - Service-Disabled Veteran Owned - Women-Owned Business Participation General Requirements - Insurance Required Performance Bond 100 % - Labor and Materials Bond 100 %

GC Bidding

Water / Sewer

$500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
20
Bidding Soon
117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.