Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 7, 2026 at 8:00 PM
Updated May 16, 2026
Renovation of a multi-residential development in Farrell, Pennsylvania. Completed plans call for the renovation of a multi-residential development.
Mercer County Housing Authority is accepting bids to convert the Chavers Center to a Veterans Shelter. This work will include demoing walls, framing, drywall work, electrical, plumbing, mechanical, and creating an accessible shower. There are approved drawings for this work. The bids requested are for three out of the eleven work items in the plans. The job location is 211 Federal St. Farrell, Pa. 16121. All bids are to be marked "Veterans Shelter Conversion II" and mailed in or dropped off in a sealed envelope at 80 Jefferson Ave Sharon, Pa. 16146 before the specified deadline. Any bids submitted after the deadline will not be opened. Lower-Level Accessible Full Bath Work Scope: Create full bath with handicap shower and laundry room at the lower level. (See Sheet AO.3) 2. Demo room 15 and 16 down to the block walls. All built in shelving, sink, and radiator in room 16. The radiator piping will need cut back and capped above ceiling height. 3. All new construction walls will be metal studs, R13 Insulation, 5/8 drywall on both sides (Smooth Finish), primed and painted, and rubber cove base. (See Sheet A1.1 ) 4. Room 15 will be converted to a full bath with an accessible shower. (See Sheet AO.3, A1.3, and M1.0) 5. Room 15 will get a drywall ceiling with a 30”x30” access panel. Verify in the field location for the access panel. 6. Electrical outlets, switches, and lighting 4’x2’ LED panels. (See Sheet AO.5, E1.3) 7. The concrete block wall dividing Room 15 and 16 will get demoed to accommodate the new shower. 8. Install roll-in accessible shower. (See Sheet A1.3) 9. Install exhaust fan in room 15. (See Sheet E1.3, and M1.0) 10. The lower-level bathrooms. Replace the children’s toilets with standard height toilets. (See Sheet A1.1) 11. Room 16 will be converted into a laundry room. (See Sheet AO.3, AO.5 and M1.0) 12. Both rooms 15 and 16 have concrete floors to cut open and expose the existing plumbing to install the new drains in specified locations. Verify in the field locations of the existing drains. 13. Everything will be required to meet minimum state and federal code. 14. The contractor is responsible for keeping a clean work area. Other trades will be working on site at the same time respect each other’s space.
Sub-Bidding
Multi-Residential
$300,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 28, 2026
June 29, 2026
211 Federal St, Farrell, PA
Related To This Project
Farrell, PA
Bid Date: May 28 2026
Farrell, PA
Bid Date: Apr 02 2026
Farrell, PA
Bid Date: Mar 18 2026
Farrell, PA
Bid Date: Mar 18 2026
Farrell, PA
Bid Date: Jan 13 2026
Farrell, PA
Bid Date: Oct 29 2025
Farrell, PA
Bid Date: Jun 17 2025
Farrell, PA
Bid Date: Apr 11 2025
Farrell, PA
Bid Date: Jan 30 2024
Farrell, PA
Bid Date: Jan 30 2024
Farrell, PA
Bid Date: Dec 01 2023
Farrell, PA
Bid Date: Nov 02 2023
Farrell, PA
Bid Date: Mar 21 2022
Farrell, PA
Bid Date: May 10 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
