BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 26, 2026 at 8:00 PM

Updated May 27, 2026

Demolition, site work and new construction of a mixed-use development in Santa Cruz, California. Working plans call for the demolition of a fire / police facility; for site work for a 25,508-square-foot, one-story above grade fire / police facility; fire / police facility; and for the construction of a fire / police facility.

**As of May 26, 2026 project has been canceled. As of this time it is unknown if when project will rebid. Project has been cancelled The project involves the installation of a concrete pad and utilities for a metal storage building. The concrete must meet all specifications on the plans and will be able to hold the weight of fire apparatus of approximately 55,000 lbs each. Its primary goal is to establish a functional storage facility for fire department apparatus and equipment. 5.2. Scope of Work The following is the scope of work needed: o Demolition (saw cut and removal of existing AC material) o Utilities (trenching for electrical and fire sprinklers, electrical pipe installation) o Concrete Pad Installation (includes subgrade preparation, form work, rebar installation, concrete pour and finish work, AC conforms, building anchorage installation) o Remove existing storm drain inlet connection and install/connect new Bio-Retention Area. Bidders shall review and adhere to the following: o Green Building Checklist o Site management & bmps per plans o Construction waste reduction, disposal and recycling o Product gwp compliance o Finish material pollutant control o Coordinate and work with other contractors as required to execute all work listed on plans. o Schedule, attend, and complete all required inspections for listed scope of work with the applicable City of Santa Cruz inspectors and special inspector Pacific Crest Engineering per the building permit plans. o All refuse and recycling activities during construction must comply with Chapter 6.12 of the Santa Cruz Municipal Code and be accounted for on the Construction Waste Management Plan. o All work must comply with the building permit plans, as well as state and local codes. Please review the attached issued building permit plans and specifications. Bidders must adhere to the Green Building Checklist, coordinate and work with other contractors as required, schedule and complete all required inspections with City of Santa Cruz inspectors and special inspector Pacific Crest Engineering, ensure compliance with the Construction Waste Management Plan, and conform to all applicable state and local codes. Contractors must hold a valid and current general A or B contractor license, have at least three years of relevant experience, maintain required insurance and bonding, be properly registered and in good standing with the State of California, and possess a valid business license from the City of Santa Cruz prior to contract award. All subcontractors must be registered with the California Department of Industrial Relations. Contractor responsibilities include maintaining standards of employee conduct, providing adequate supervision, ensuring compliance with City rules while on City premises, removing unfit employees upon City request, and ensuring onsite employees can communicate in English. All work must be conducted safely and in compliance with CAL/OSHA and other applicable safety regulations. The contractor will provide all tools, equipment, labor, supervision, and management to complete the described work. All work must comply with the issued building permit plans and specifications. IFB Questions and Clarification Due Date:May 12, 2026, 5:00pm

Final Planning

Fire / Police

$200,000.00

Public - City

Demolition, New Construction, Site Work

20

10

10

5

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
337
Active Projects
158
Bidding Soon
2,705
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2026

November 26, 2026

Project location map

335 Younglove Ave, Santa Cruz, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.