BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 15, 2026

Site work and new construction of a mixed-use development in North Ogden, Utah. Completed plans call for the construction of a 42,800-square-foot detention facility.

Weber County is seeking proposals from well qualified and experienced contractors to provide all services associated with Construction Management (pre-construction design phase) and General Contracting for constructing a new Weber County Jail Medical & Mental Health Housing Wing and all associated site improvements. The project is located at 1400 Depot Drive, Ogden City, Utah. The Medical Wing, as conceptually designed, will provide approximately 42,800 ft2 of gross building area with a main-level footprint of approximately 15,000 ft2, including medical staff space, medical infirmary, clinic, dental operatory, pharmacy, holding, control, male and female housing with recreational areas, general storage, and basic amenities found in a correctional facility's medical and mental health facility. The building design will include specialized technology, equipment, and systems compatible with the existing facility. The budgeted cost of the project is approximately $22 million. The goal is to identify a contractor that can deliver high-quality pre-construction phase and construction services while adhering to the project's budget. Approximate Notice of Selection Results and Award: Week of May 25, 2026 thru May 29, 2026. If no presentations are conducted this will be moved a week earlier This will be done through two separate contracts: one for pre-construction services and one for services as the general contractor, including construction and one-year-warranty period services. The County reserves the right to award the general contractor contract to the preconstruction contractor or to a contractor other than the pre-construction contractor. Question Deadline 05/12/2026 at 5:00 PM MT All questions shall be directed to U3P-Bonfire

Post-Bid

Jails / Prisons

$22,000,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2026

July 13, 2026

Project location map

1400 Depot Dr, North Ogden, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.