Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 28, 2026 at 8:00 PM

Updated September 30, 2026

Site work and new construction of a civil project in Prescott, Arizona. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The City of Prescott, Arizona, is advancing its long-term wastewater infrastructure centralization initiative through the Sundog Trunk Main Sewer Phase C3 Project. This critical capital improvement project supports the consolidation of wastewater treatment operations from the Sundog Wastewater Treatment Plant to the more modern and expandable Airport Water Reclamation Facility. It addresses capacity limitations, mitigates risk of sanitary sewer overflows highlighted by 2023 storm events that led to an ADEQ consent order, lowers long-term operations and maintenance costs, and enhances overall system reliability for current and future growth. Strategic Importance This phase is part of a multi-year, phased program to consolidate Prescott's wastewater system. It directly supports the 2023 Water and Wastewater Models Master Plan by increasing conveyance capacity, eliminating bottlenecks from undersized or failing pipes, and enabling the eventual decommissioning of the Sundog plant. Benefits include improved environmental protection, enhanced public health and safety, and cost savings through more efficient operations. Opportunity for Vendors This is a significant public works project with substantial construction value. It offers experienced contractors and subcontractors in sewer force main installation, lift station construction, directional drilling or open-cut methods, pipeline rehabilitation, and utility work in urban/historic corridors an excellent opportunity to partner with the City of Prescott on a high-impact community infrastructure upgrade. he Sundog Trunk Main Sewer Phase C3 Project is essential to The City of Prescott's centralization initiative consolidating treatment operations from the Sundog Wastewater Treatment Plant (SWTP) to the more modern and expandable Airport Water Reclamation Facility (AWRF). This multi-year program, adopted by a City Council resolution in 2015, aims to create a single, centralized facility combining SWTP's 3 MGD and AWRF's 4.75 MGD capabilities. Phase C3 represents a critical component of this centralization effort. It builds on prior phases by enabling the redirection of flows from the downtown and surrounding areas to the Airport Water Reclamation Facility. Completion supports the eventual decommissioning of the Sundog plant, delivering significant long-term operational savings, improved system reliability, and enhanced environmental compliance. This project is vital for several reasons: Capacity and Growth: It addresses current and future wastewater capacity limitations identified in the 2023 Water and Wastewater Models Master Plan, supporting Prescott's development and existing population needs. Question Submission Deadline: October 6, 2026, 5:00pm All inquiries, requests for information, or requests for clarifications must be received by the City Procurement Contact: Jaimie Sventek Contracts Coordinator City of Prescott - Purchasing contracts@prescott-az.gov Pre-Construction Meeting:Week of November 16, 2026 Anticipated Notice to Proceed:November 30, 2026 Anticipated Expected Completion Date:May 31, 2028 Downtown Regional Lift Station: Construction of a new regional lift station near the Granite Creek Park / 6th Street area. 26-inch Force Main: Approximately 25,000 linear feet of 26" force main, routing from the new lift station northward along 6th Street, westward on Merritt Avenue and Montezuma Street, northward on Ruth Street and Demerse Avenue, eastward on Prescott Heights Drive, northward on Campbell Avenue, eastward on Rosser Street, and northward on Highway 89 to connect with an existing force main stub at Highway 89 and Prescott Lakes Parkway. 24-inch Gravity Sewer Trunk Main and Branch Mains: Approximately 2,500 linear feet of 24” sewer trunk main and 8” branch mains along Granite Creek from eastern Sonora Drive, under La Guardia Bridge / Montezuma Street, through Granite Creek Park to the new lift station

GC Bidding

Water / Sewer

$85,000,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
36
Bidding Soon
860
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2026

November 30, 2026

Project location map

Multiple Locations, Prescott, AZ

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed