BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 19, 2026

Site work and paving for a sidewalk / parking lot in Redmond, Washington. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The work includes construction of pedestrian and bicycle improvements, which comprises construction of various curb ramps and cement concrete sidewalk, installation of rectangular rapid flashing beacon systems, roadway paving, channelization, signage restoration, and all other work necessary to complete the project. Bids must follow the instructions outlined in Section 1-02.9. Bidders must submit the Subcontractor List with the bid package by the specified deadline. All bid proposals must be accompanied by a bid deposit in the form of a certified or cashier's check or surety bid bond for a sum not less than five percent (5%) of the total bid amount including sales tax and all listed additives and alternates. All physical work must be completed in the time specified in Section 1-08.5. The project requires mandatory apprentice utilization at 15% in accordance with RCW 39.04.320 and Redmond Municipal Code 15.28. Contractors must meet requirements stated in Section 1-07.9(3) of the special provisions. There are monetary incentives for contractors meeting apprentice utilization and penalties for those who do not and fail to demonstrate a Good Faith Effort. Plans, contract provisions, addenda, and supplementary information are available online through the Builders Exchange of Washington. Bidders are encouraged to register as a bidder to receive notifications. The City reserves the right to reject any or all bids and to waive any informalities or irregularities in the bid or bidding process and to make the award as deemed in the City's best interest. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Work to be performed shall include: Construction of pedes-trian and bicycle improvements, including but not limited to con-struction of various curb ramps and cement concrete sidewalk, installation of rectangular rapid flashing beacon systems, roadway paving, channelization and sig. nage restoration, and other work necessary to complete the project Engineer's Estimate for this work 16 $2,280,000 to $2,790,000. Question Deadline 05/19/2026 Questions or comments about these Bid Documents should be directed in writing only (mail or email) to the attention of the Citys Project Manager/Project Engineer: Deepali Jodh, PO Box 97010, MS1NPW, Redmond, WA 98073- 9710, or djodh@redmond.gov.

GC Bidding

Sidewalks / Parking Lot

$2,790,000.00

Public - City

Paving, Site Work

60

5

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
113
Bidding Soon
1,330
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2026

July 20, 2026

Project location map

Multiple Locations, Redmond, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.