BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 16, 2026

Demolition and site work for a parking garage in Racine, Wisconsin. Completed plans call for the demolition of a parking garage; and for site work for a parking garage.

The Contractor shall perform the work to include, but not be limited to 1. Contractor shall review all Pre-Demolition inspection reports and other historic reports made available at City of Racine's City Hall. 2. Contractor shall perform a Pre-Construction Survey. Contractor shall submit a Pre-Construction Survey Report to Engineer. 3. The Contractor shall perform an engineering inspection in accordance with OSHA 1926.850 and prepare and submit a Health and Safety Plan (HASP) addressing how risks identified in the engineering inspection will be managed for information purposes. The Contractor shall prepare and submit a Waste Management Plan for approval, a Fugitive Emissions Management Plan (FEMP) for approaval, a Deconstruction and Demolition Work Plan for informational purposes, and a Geotechnical Testing Plan for approval. The Contractor shall submit plans to the Owner's Representative for approval.. Before commencing Work of each phase, submit an updated copy of the Contractor's construction schedule showing the sequence, commencement and completion dates for all phases of the Work. The contractor shall submit a Plan for shoring existing building walls to retain surrounding soils. The shoring plan shall be stamped by a currently licensed State of Wisconsin Structural Engineer and shall include the following: product sheets, schedules, pay applications, quality reports, and all other documentation required by the specifications and Contract to the owner's representative for Informational Purposes. Approvals will be provided by the Owner or Owner's Representative. If approval is not granted, the Contractor shall address the review comments and resubmit. No work shall be performed until all Plans and Submittals are approved. Question Deadline 05/21/2026 Deadline for submitting a prequalification application is five (5) days prior to the time of bid opening. This project entails demolishing the McMynn PArking Ramp in the City of Racine

Sub-Bidding

Parking Garage

$1,000,000.00

Public - City

Demolition, Site Work

50

12

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
542
Active Projects
259
Bidding Soon
3,207
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2026

July 6, 2026

Project location map

120 7th St, Racine, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.