Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 11, 2026

Site work for a water / sewer project in Tucson, Arizona. Completed plans call for site work for a water / sewer project.

The City of Tucson, Tucson Water Department, intends to implement further advanced treatment for potable distribution utilizing Class A+ secondary treated effluent from Pima County's existing water reclamation facilities. The new Advanced Water Purification Facility (AWPF) will have a production capacity of 2.5 million gallons per day (MGD). The Project aims to utilize a portion of the City's local water resources to diversify the water resource portfolio, improve water quality and supply reliability, address distribution system capacity issues due to PFAS-related well shutdowns, and provide long-term conservation benefits for both the local community and the Colorado River system. The Operator, under its O&M Agreement with the City, is required to coordinate with and provide input to the City and the Design-Builder during the design and construction of the AWPF, but the Operator's primary responsibility will be operations and maintenance of the AWPF. The Design-Builder will be responsible for the design and construction of the facility. Question Deadline 05/27/2026 at 5:00 PM MT QUESTIONS SHALL BE DIRECTED TO: Norma Camacho (520) 837-4132 norma.camacho@tucsonaz.gov

Post-Bid

Water / Sewer

$25,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
23
Bidding Soon
658
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2026

August 3, 2026

Project location map

To be determined, Tucson, AZ

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed