BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 28, 2026 at 8:00 PM

Updated May 29, 2026

Site work and paving for a road / highway in Chelmsford, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project consists of full depth reclamation and paving. Bonds: Certified Check required, 5% Bid Bond. Pavement-Surfacing in the amount of $2,753,387.50. Any questions regarding this Bid should be addressed to Trevor Collins, Assistant Town Engineer, by email: tcollins@chelmsfordma.gov. The Town of Chelmsford DPW - Division is requesting bids from Qualified Contractors. The work under this contract will include all equipment, labor, material, supplies, etc. necessary to furnish the work described in this contract. The major work includes full depth reclaim, finish grading and full depth paving with associated drainage work, edging/curb/berm work, sidewalk work, etc. within the Town of Chelmsford, MA. Amble Road Rack Road Canter Road Clarissa Road Fisher Road Janet Road Colonial Drive North Road (Route 40) Dead End Colonial Terrace Colonial Drive (West) Colonial Drive (East) Chestnut Hill Road Prancing Road Galloway Road Galloway Road Town Line Pine Hill Road Proctor Road Acton Road (Route 27) Town Line Tadmuck Road (Chelmsford) Littleton Road Town Line Tadmuck Road (Westford) Town Line Turn Around Area Twiss Road Main Street Dead End 40 Swain Road Swain Road Fence Line All streets will be completely reclaimed as shown on the plans and as directed by the Engineer in the field at the time of the work. Once the reclamation of the streets is completed rough/partial grading will be done to make the streets passable for traffic until work is completed on the street. Drainage improvements are also required on Proctor Road, Tadmuck Road, and Twiss Road which requires the installation of Catch Basins, Leaching Basins and Manholes along with associated High Density Polyethylene (HDPE) Pipe. Due to the altering of grades, some areas will also require granite edging/curb to be removed and reset/stacked, asphalt berm to be removed and discarded and then a new asphalt berm to be installed, and sidewalks and driveways to be adjusted/redone in various areas. An ADA Compliant Walkway is also required at Harrington School. The work shall include the construction of an approximately 260-linear foot asphalt walkway and a paved viewing area measuring 10 feet in width by 20 feet in length. The walkway shall be constructed to meet the requirements of the ADA Standards for Accessible Design for accessible routes. The walkway shall be a minimum of 5 feet in width, constructed with a maximum running slope of 5% and a maximum cross slope of 1.5%. This work shall require excavation and preparation of subgrade, furnishing and installing suitable base materials, fine grading and asphalt paving. The Contractor shall construct side slopes along the walkway at a 2:1 slope (H:V) where descending to existing grade and slope armor stone shall be installed at a 1:1 slope (H:V) where transitioning up to existing grades.

Post-Bid

Roads / Highways

$2,753,387.00

Public - City

Paving, Site Work

47

5

2

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
799
Active Projects
487
Bidding Soon
5,371
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2026

July 12, 2026

Project location map

Multiple Locations, Chelmsford, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.