Published May 12, 2026 at 8:00 PM
Updated May 16, 2026
Site work and new construction of a mixed-use development in Chugcreek, Wyoming. Working plans call for site work for a power facility; road / highway; and for the construction of a power facility.
Provides all labor, materials, tools, equipment, transportation, and other resources required to upgrade the existing Glendo-Lusk Rural Tap transmission system and construct a new substation to improve reliability and operational efficiency of the Western Area Power Administration's Rocky Mountain Region transmission network. The work includes upgrading approximately 35 miles of the existing 69-kV Lusk Rural Tap-Glendo transmission line to a 115-kV wood pole H-frame transmission line, resolving deteriorated conditions and accommodating higher voltage operation, longer spans, and increased clearance requirements. Construction will occur primarily within the existing right-of-way, widened by approximately 20 to 25 feet. The upgrade begins at the Glendo Substation and extends generally northeast for approximately 25.4 miles to a new delivery point substation named Quinn Creek. From the Quinn Creek Substation, the line continues approximately 3 miles northeast, then approximately 6 miles east, terminating at the Lusk Rural Tap west of the town of Lusk. The project is sectionalized into a 25.4-mile Casper (Pace)-Quinn Creek segment constructed and operated at 115-kV and a 9.4-mile Quinn Creek-Lusk Rural Tap segment constructed to 115-kV standards but operated at 69-kV in the near term. Construction of the new Quinn Creek Substation includes development of a 69-kV delivery point on approximately five acres of open rangeland. The anticipated period of performance is up to 800 calendar days after notice to proceed, with completion no later than December 2028. The magnitude of construction is estimated to exceed $10 million. The work is solicited under FAR Part 14 as a sealed bidding requirement and is set aside 100 percent for small businesses under NAICS 237130. Buy American Act requirements apply, and bidders must identify any non-domestic materials proposed. Location: Platte County and Niobrara County, Wyoming. Glendo Substation, 524 Glendo Park Road, Glendo, WY 82213. Lusk Rural Tap located near Latitude 42 46'00" N, Longitude 104 28'52'' W (NAD83/WGS84). The Method of Contractor Selection has not been determined at this Time.
Final Planning
Power Plant
$10,000,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 3, 2026
Multiple Locations, Chugcreek, WY
Related To This Project
Chugcreek, WY
--
Chugcreek, WY
Bid Date: May 08 2025
Chugcreek, WY
--
Chugcreek, WY
--
Chugcreek, WY
Bid Date: Jun 20 2023
Cheyenne, WY
Bid Date: May 21 2026
Riverton, WY
Bid Date: May 15 2026
Wilson, WY
Bid Date: May 12 2026
Green River, WY
Bid Date: Mar 27 2019
Casper, WY
Bid Date: May 14 2026
Laramie, WY
Bid Date: May 26 2026
Moose, WY
Bid Date: May 20 2026
Moose, WY
Bid Date: May 18 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.