BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 1, 2026 at 8:00 PM

Updated June 2, 2026

Site work and addition to a water / sewer project in Elk Grove, California. Completed plans call for the addition of a water / sewer project.

Domestic Water Generator Additions at Various Sites. The project is accepting bids and involves the addition of domestic well generators at multiple sites for the Elk Grove Unified School District. pn-02-123710, 34-17, 25002.121.01 Cosumnes River Elementary School - Domestic Water Generator Addition Location: 13580 Jackson Rd. Sloughhouse, California 95683 Project consists of the installation of a backup propane-fueled power generator system to serve the existing domestic water well. Generator shall be connected to existing propane storage tanks. Work includes concrete foundations, generator equipment, transfer switch, electrical connections, and associated site improvements required to provide a complete and operational system. Plumbing lines shall be bored to minimize impacts to campus occupants. Work will occur on an occupied campus and shall be coordinated with District staff to minimize disruption to ongoing school operations. Old Franklin Elementary School - Domestic Water Generator Addition Location: 4011 Hood Franklin Rd. Elk Grove, California 95758 Project consists of the installation of a backup natural gas-fueled power generator system to serve the existing domestic water well. Generator shall be connected to existing gas service infrastructure. Work includes concrete foundations, generator equipment, transfer switch, electrical connections, and associated site improvements required to provide a complete and operational system. This project will be performed on a non-occupied campus. Pleasant Grove Elementary School - Domestic Water Generator Addition Location: 10160Pleasant Grove School Rd. Elk Grove, California 95624 Project consists of the installation of a backup propane-fueled power generator system to serve the existing domestic water well. Generator shall be connected to existing propane storage tanks. Work includes concrete foundations, generator equipment, transfer switch, electrical connections, and associated site improvements required to provide a complete and operational system. Work will occur on an occupied campus and shall be coordinated with District staff to minimize disruption to ongoing school operations. Sierra Enterprise Elementary School - Domestic Water Generator Addition Location: 9115 Fruitridge Rd. Sacramento, California 95826 Project consists of the installation of a backup natural gas-fueled power generator system to serve the existing domestic water well. Generator shall be connected to existing gas service infrastructure. Work includes concrete foundations, generator equipment, transfer switch, electrical connections, and associated site improvements required to provide a complete and operational system. Plumbing lines shall be bored to minimize impacts to campus occupants. Work will occur on an occupied campus and shall be coordinated with District staff to minimize disruption to ongoing school operations. All RFI/questions shall be submitted to both Michael Bean at mbean@egusd.net and Jennifer Jedlicka at jjedlick@egusd.net no later than Thursday, May 28, 2026 by 2:00 p.m. 1. Installation of a backup power generator serving the domestic water well. 2. Other work as shown in the documents and as required for a complete an operational project

Sub-Bidding

Water / Sewer

$500,000.00

Public - City

Addition, Site Work

37

37

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
439
Active Projects
203
Bidding Soon
3,496
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2026

July 6, 2026

Project location map

Multiple Locations, Elk Grove, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.