Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 12, 2026 at 7:00 PM

Updated November 18, 2026

This is a service / maintenance or supply contract in Batavia, Illinois. Contact the soliciting agency for additional information.

This scope of work consists of rebuilding and renovating the Kautz Road Substation (KRS), identified as UIP Subproject SP-2. The KRS supplies electrical power to multiple laboratory buildings and systems that support both conventional facility operations and process utility requirements. The project is intended to revitalize and expand the substation to ensure continued support for existing electrical demands and accommodate future load growth. The General Contractor shall furnish all required supervision, labor, materials, tools, equipment, transportation, plant, and appurtenances necessary to perform all work described in the drawings and technical specifications. The work includes all associated overhead, bonding costs, safety oversight, quality control, project management, and supervision required to complete the construction effort. Construction activities include demolition, site work, civil, structural, architectural, electrical, and related improvements necessary to modernize and expand the existing substation. The contractor shall coordinate procurement, fabrication, submittals, requests for information (RFIs), shop drawing approvals, construction sequencing, installation, testing, and commissioning activities required for successful project completion. The project must be performed within Fermilabs accelerator shutdown window. Key milestones include completion of submittals and procurement activities within 60 calendar days after Notice to Proceed (NTP), commencement of construction activities within the Kautz Road Substation yard beginning January 4, 2028, completion of building foundations and readiness for placement of a new prefabricated control house by March 31, 2028, issuance of Authorization for Use and Possession (AUP) for the renovated substation facility by July 2, 2029, and final project completion by September 30, 2029. Location: Fermi National Accelerator Laboratory (Fermilab), Kirk Road and Pine Street, Batavia, IL 60510.

GC Bidding

Power Plant

$3,000,000.00

Public - Federal

Service, Maintenance and Supply

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
562
Active Projects
261
Bidding Soon
3,826
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2026

January 1, 2028

Project location map

To Be Determined, Batavia, IL


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed