Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 12, 2026 at 7:00 PM
Updated November 18, 2026
This is a service / maintenance or supply contract in Batavia, Illinois. Contact the soliciting agency for additional information.
This scope of work consists of rebuilding and renovating the Kautz Road Substation (KRS), identified as UIP Subproject SP-2. The KRS supplies electrical power to multiple laboratory buildings and systems that support both conventional facility operations and process utility requirements. The project is intended to revitalize and expand the substation to ensure continued support for existing electrical demands and accommodate future load growth. The General Contractor shall furnish all required supervision, labor, materials, tools, equipment, transportation, plant, and appurtenances necessary to perform all work described in the drawings and technical specifications. The work includes all associated overhead, bonding costs, safety oversight, quality control, project management, and supervision required to complete the construction effort. Construction activities include demolition, site work, civil, structural, architectural, electrical, and related improvements necessary to modernize and expand the existing substation. The contractor shall coordinate procurement, fabrication, submittals, requests for information (RFIs), shop drawing approvals, construction sequencing, installation, testing, and commissioning activities required for successful project completion. The project must be performed within Fermilabs accelerator shutdown window. Key milestones include completion of submittals and procurement activities within 60 calendar days after Notice to Proceed (NTP), commencement of construction activities within the Kautz Road Substation yard beginning January 4, 2028, completion of building foundations and readiness for placement of a new prefabricated control house by March 31, 2028, issuance of Authorization for Use and Possession (AUP) for the renovated substation facility by July 2, 2029, and final project completion by September 30, 2029. Location: Fermi National Accelerator Laboratory (Fermilab), Kirk Road and Pine Street, Batavia, IL 60510.
GC Bidding
Power Plant
$3,000,000.00
Public - Federal
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 18, 2026
January 1, 2028
To Be Determined, Batavia, IL
Related To This Project
Batavia, IL
Bid Date: Jun 03 2026
Batavia, IL
Bid Date: May 19 2026
Batavia, IL
Bid Date: Jun 12 2026
Batavia, IL
Bid Date: Jun 25 2026
Batavia, IL
Bid Date: Apr 16 2026
Batavia, IL
Bid Date: May 01 2026
Batavia, IL
Bid Date: Apr 30 2026
Batavia, IL
Bid Date: Apr 22 2026
Batavia, IL
Bid Date: Apr 30 2026
Batavia, IL
Bid Date: Apr 16 2026
Batavia, IL
Bid Date: May 21 2026
Batavia, IL
Bid Date: Apr 09 2026
Batavia, IL
Bid Date: Apr 22 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed