BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Site work, paving and renovation of a mixed-use development in North Palm Beach, Florida. Conceptual plans call for the renovation of a playground / park / athletic field; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and playground / park / athletic field.

The Parking Lot Enhancement Project will add approximately 100 parking spaces to the Country Club property by eliminating one or two bays (2 or 4 courts) of tennis courts, which will be determined during the planning phase of the project. This addition of parking for the better overall use of the club provides an opportunity to significantly enhance the tennis center, utilizing the space currently occupied by employee parking. These enhancements will conceptually include four brand-new courts, renovation of the remaining existing 8 courts to replace the outdated irrigation design, dilapidated fencing, and a new centrally located modular tennis center facility. The project is designed to alleviate morning congestion on the courts, while increasing revenue by supporting a broader range of programming-including leagues, clinics, lessons, events, memberships, and social play. New fencing and additional lighting will be installed as needed. A modular tennis center building will be centrally located between the courts. The facility will include: A front desk and pro shop with retail Professional staff offices A multipurpose room Restrooms A small café A wrap-around deck for viewing and socializing The perimeter fence will connect directly to the new building to ensure controlled access through the tennis shop, streamlining entry and registration. The first phase of this project will be to provide a conceptual plan with pricing to ensure a viable amount of parking and tennis courts. The project is include in the City's 2026-2030 Capital Improvement Program (CIP) As of May 15, 2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. The method of Contractor Selection has not been Determined at this time.

Conceptual

Playgrounds / Parks / Athletic Fields

$2,350,000.00

Public - City

Paving, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
230
Active Projects
84
Bidding Soon
1,398
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2028

Project location map

951 US-1, North Palm Beach, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.