BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 10, 2026

Site work and paving for a water / sewer project in Bellwood, Illinois. Completed plans call civil work for a levee.

Installation of bioretention areas along Hyde Park Avenue in the Village of Bellwood. This project consists of installing bioretention areas along Hyde Park Avenue within the Village of Bellwood. The work to be performed shall include installing drainage structures, replacing or repairing defective drainage structures, installing and replacing sewer, removal and replacement of curb and gutter, sidewalks, and driveway aprons, installation of barrier curb, earth excavation, installation of course aggregate, engineered soil, and native plantings, pavement patching, hot-mix asphalt surfacing, landscaping restoration of the parkways, and other related work. Bonds: 5% Bid Bond, 100% Performance Bond.

Post-Bid

Water / Sewer

$1,500,000.00

Public - City

Paving, Site Work

21

6

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
416
Active Projects
204
Bidding Soon
4,345
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2026

July 6, 2026

Project location map

Hyde Park Ave, Bellwood, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.