BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 21, 2026 at 8:00 PM

Updated May 22, 2026

Demolition, site work and new construction of a water / sewer project in Winthrop, Washington. Completed plans call for the construction of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

Project includes replacement and decommissioning of an existing lift station and force main. New construction includes an 8-foot diameter caisson wet well, valve vault, two 4-inch HDPE force mains, sanitary sewer piping, manholes, pumps and controls, electrical work, an off-site standby generator, site grading, retaining wall, and fencing. Work involves a construction pause over winter, with completion expected in spring 2027.

GC Bidding

Water / Sewer

$3,000,000.00

Public - City

Demolition, New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
20
Bidding Soon
262
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2026

July 24, 2026

Project location map

206 Riverside Avenue, Winthrop, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.