Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2026 at 8:00 PM

Updated August 6, 2026

Site work and new construction of a playground / park / athletic field in Salina, Kansas. Completed plans call for the construction of a playground / park / athletic field.

Site preparation and construction of new pre-fabricated shade structures at USD 305 Heartland Programs, 700 Jupiter Ave., Salina, KS. The work includes earthwork, site excavation, installation and compaction of LVC and crushed concrete base; construction of concrete sidewalks and slabs for pedestrian access to shelter areas and around playground; construction of shelter/pavilion footings and foundations (foundation systems to be designed and drawings provided by the shelter manufacturer and sealed by a Kansas licensed structural engineer); provision and installation of gutters and downspouts as indicated on the drawings (not provided by the shelter manufacturer); installation of temporary site fencing around the construction area. Davis-Bacon Federal Wage Rates are applicable. The General Construction Contract encompasses general construction, site utilities, site structures, fencing, seeding, and related work into one contract, with the General Contractor responsible for all work. Bidders are expected to familiarize themselves with the site prior to bidding. The Owner reserves the right to accept or reject any or all bids and to waive informalities.

Under Construction

Playgrounds / Parks / Athletic Fields

$86,921.00

Public - City

New Construction, Site Work

3

14

2

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
20
Bidding Soon
327
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2026

July 1, 2026

Project location map

700 Jupiter Ave, Salina, KS


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed