BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 12, 2026 at 8:00 PM

Updated June 13, 2026

Site work and new construction of a communication facility in Columbus, Nebraska. Completed plans call for the construction of a communication facility; and for site work for a communication facility.

Procurement and installation of a prefabricated control building for a 345kV substation at Princeton Road Station. The CONTRACTOR shall provide all planning, material coordination, schedule preparation, labor, supervision, miscellaneous materials, tools, apparatus, equipment, conveyances, mobilization, assembly, and demobilization as necessary to provide one (1) 28-feet x 80-feet factory prefabricated substation Control Building with all components including miscellaneous equipment for the DISTRICT'S Princeton Road Station 345 kV Substation in accordance with the Contract. The CONTACTOR shall assemble the 28-feet x 80-feet Control Building on pier foundations designed and installed by others. Bonds: Certified Check required, Other Bond required (unspecified amount), Bid Bond required (unspecified amount). Should the Bidder have questions concerning the Contract Documents, they shall direct their questions to Melinda (Mindy) Evans, Senior Procurement Specialist, at (402) 563-5438, by fax at (402) 563-5034, or by e-mail at maevans@nppd.com.

GC Bidding

Communication

$3,000,000.00

Public - State/Provincial

New Construction, Site Work

3

8

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
80
Bidding Soon
902
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2026

August 24, 2026

Project location map

Princeton Road Station, Columbus, NE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.