BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 22, 2026 at 8:00 PM

Updated May 23, 2026

Remodeling of a recreation facility in Minot AFB, North Dakota. Completed plans call for the remodel of a recreation facility.

The Project is a multiple prime bid (with an option of a combined bid) which includes but is not limited to the following highlights of Work: Contract No. 1 – General Prime Construction for the construction of interior improvements including indirect sports lighting integrated with interior light-reflective liner system, and other interior specialties, to meet Substantial Completion and Final Completion in accordance with the contractors bid but Substantial Completion shall not be later than October 2, 2026; including replacement of 12-foot tall perimeter wall protection screening, installation of light-reflective interior liner system over and around existing steel structure and roof-hung indirectly facing LED lights at each of (4) existing tennis courts, removal and replacement of column protection pads at steel columns, replacement of (3) sections of divider curtains between the (4) existing tennis courts as an Alternate Bid No 1, addition of interior insulation between the reflective liner panel and the existing steel substrates as an Alternate Bid, general project management, meetings, schedule control, and project reporting, and a two year warranty period and liquidated damages for non-compliance with schedules. Contract No. 2 – Electrical Prime Construction for the construction of interior improvements including indirect sports lighting integrated with interior light-reflective liner system, and other interior specialties, to meet Substantial Completion and Final Completion in accordance with the contractors bid but Substantial Completion shall not be later than October 2, 2026; including removal of existing fluorescent tube lights, providing new LED indirect LED light fixtures including installation of related conduits and conductors and controls, compliance with the overall project schedule, and a two year warranty period and liquidated damages for non-compliance with schedules. Contract 1 includes Alternate Bid 1 – Divider Curtains, Contract 1 includes Alternate Bid 2 – Interior Insulation. Bids are requested for General Construction Contract 1 and Electrical Construction Contract 2 and a Combined Contract 3. Refer to the Instructions to Bidders included in the Bidding Documents for all further requirements regarding bid submittal, qualifications, procedures, and contract award.

GC Bidding

Amusement and Recreation

$500,000.00

Public - City

Remodeling

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
13
Bidding Soon
131
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2026

July 31, 2026

Project location map

To Be Determined, Minot AFB, ND

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.