Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 2, 2026 at 8:00 PM
Updated June 10, 2026
Site work for a water / sewer project in Shelby, North Carolina. Completed plans call for site work for a water / sewer project.
The City of Shelby is requesting bids for the Hendrick Basin Outfall Sewer Replacement Project, located near 406 Floyd Street. The work will occur within the sewer right-of-way and will not require trench pavement repair. The project bid will be a unit price bid, and bidders must use the provided bid form. The contractor is responsible for utility locates per the NC Underground Utility Safety and Damage Prevention Act. A one-year warranty is required starting from Final Completion. A preconstruction meeting will be required before construction starts. Sealed bids must be delivered to the City of Shelby Utility Operation Center by the specified deadline. Question Deadline 05/28/2026 at 4:00 PM ET All inquiries must be submitted in writing by email to the following address : brad.greene@cityofshelby.com . Replace 500 feet of the existing 10 - inch VCP with a new 10 - inch SDR21 PVC pipe . Replace one ( 1) existing brick manhole with a new four -foot diameter precast manhole . Manhole Depth range is 0-6 feet . Approximate depth of the existing manhole is 4.6 feet . Replace two (2) existing brick manholes with new four -foot diameter precast manholes . Manhole Depth range is 6-13 feet . Approximate depth of each of the two existing manholes are 13 feet and 9.5 feet . Install 12 -gauge solid copper tracer wire on all newly installed sewer main . Bypass pumping and equipment . Sewer Service Reconnections , with new cleanouts , to the new sewer main . If Applicable the sewer services shall be installed to five (5 ) feet behind the existing curb or edge of asphalt . A new clean out shall be installed at the back of the curb or asphalt before re - connecting to the existing service line
Post-Bid
Water / Sewer
$500,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 4, 2026
July 6, 2026
406 Floyd St, Shelby, NC
Related To This Project
Shelby, NC
Bid Date: Jun 30 2026
Shelby, NC
Bid Date: Apr 30 2026
Shelby, NC
Bid Date: May 28 2026
Shelby, NC
Bid Date: Jun 04 2026
Shelby, NC
--
Shelby, NC
Bid Date: Apr 17 2026
Shelby, NC
Bid Date: Feb 13 2026
Shelby, NC
Bid Date: Jan 06 2026
Shelby, NC
Bid Date: Jan 15 2026
Shelby, NC
Bid Date: Dec 03 2025
Shelby, NC
Bid Date: Nov 25 2025
Shelby, NC
Bid Date: Dec 04 2025
Shelby, NC
Bid Date: Nov 20 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
