Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 16, 2026 at 8:00 PM
Updated July 8, 2026
Site work for a sidewalk / parking lot in Middlebury, Vermont. Completed plans call for site work for a sidewalk / parking lot.
The project involves the removal and replacement of concrete sidewalks at specific locations within the community to enhance pedestrian safety, accessibility, and infrastructure quality. The work includes removal and replacement of sidewalk panels at multiple addresses and streets: Seminary Street Extension, Washington Street Extension, Seymour Street, Court Street, Weybridge Street, Monroe Street with concrete curb installation, Main Street and Mill Street Intersection with granite curb reinstallation, Buttolph Drive, and Elm Street. The specific locations and quantities of sidewalk panels to be replaced are marked with paint, and it is the contractor's responsibility to confirm the scope of work at each site with the town before performing any work. Contractors must provide all concrete slips to the Town and engineer. Project Components - The project consists of all work necessary to remove and replace concrete sidewalks that the Town has selected for rehabilitation, the work includes the following: o Seminary Street Ext. a. Replacement of forty-five panels (225ft) that run consecutively. Starting point is an orange paint mark with an arrow pointing East located on the sidewalk in front of #60 Seminary St Ext. The end point will be an orange paint mark with an arrow pointing West located on the sidewalk just East of Old College Farm Rd. This section also includes the following replacements: b. Replacement of 2 panels (10ft) in front of 66 Seminary Street Ext. c. Replacement of 7 panels (35ft) in front of 68 Seminary Street Ext. d. Replacement of 11 panels (55ft) in front of 72 Seminary Street Ext. o Washington Street Ext. a. Replacement of 104 panels (520ft) that run consecutively. Starting point is an orange paint mark with an arrow pointing south located on the sidewalk south of the southern entrance to Colonial Dr. The end point will be an orange paint mark with an arrow pointing north located on the sidewalk in front of the cemetery. Note: leave the two asphalt driveway entrances as is at the animal hospital. o Seymour Street a. Replacement of thirty panels (150ft) that run consecutively. Starting point is an orange paint mark with an arrow pointing north located on the sidewalk in front of #12 Seymour St. The end point will be an orange paint mark with arrow pointing south located in front of #18 Seymour St. Questions related to the bid must be submitted by email. Contractors are required to attend a mandatory site visit and pre-bid conference. The contractor is also responsible for following the painted markings to determine the precise limits of sidewalk replacement. Questions during Bid - Questions shall be emailed to Cathy Foutch of Otter Creek Engineering at Foutch@ottercrk.com by June 11 , 2026. Contractors are encouraged to copy Robert M. Clark , P.E., Clark@ottercrk.com .
Post-Bid
Sidewalks / Parking Lot
$100,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 18, 2026
July 20, 2026
Multiple Locations, Middlebury, VT
Related To This Project
Middlebury, VT
--
Middlebury, VT
--
Middlebury, VT
Bid Date: May 11 2026
Middlebury, VT
Bid Date: Jun 29 2026
Middlebury, VT
Bid Date: May 11 2026
Middlebury, VT
Bid Date: May 06 2026
Middlebury, VT
Bid Date: Apr 02 2026
Middlebury, VT
Bid Date: Feb 18 2026
Middlebury, VT
Bid Date: Mar 03 2026
Middlebury, VT
Bid Date: Mar 03 2026
Middlebury, VT
Bid Date: Feb 20 2026
Middlebury, VT
Bid Date: Dec 19 2025
Middlebury, VT
--
Middlebury, VT
Bid Date: Sep 09 2025
Middlebury, VT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
