Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 9, 2026 at 8:00 PM
Updated June 10, 2026
Site work and new construction of an educational facility in Fort Myers, Florida. Completed plans call for the construction of a 170,109-square-foot, six-story above grade educational facility; and for site work for a educational facility.
The South Village (SoVi) Student Housing Building #6 will be a 6-story, 189-unit / 535-bed, student dormitory facility approximately 170,109sf in size. The proposed building is similar to both Eagle Hall (2014) and Osprey Hall (2012), previously constructed immediately adjacent to the proposed SoVi Building #6. Similar to both Eagle Hall and Osprey Hall, proposed SoVi Building #6 will be a Class 1B fullysprinklered building in Residential Group R-2 (dormitory) classification. The proposed Scope of Work anticipated will consist of full facility design, permitting and construction to include all required professional consultants, labor, materials, equipment and other forces as may be necessary to provide a complete and compliant facility in accordance with FGCU requirements and the Building Codes and Standards as set forth herein. The following exceptions apply Civil Engineering and Surveying for the project will be the responsibility of FGCU, which will include all civil / survey services for the building, building site, remote parking lots, easements, stakeout and all site related permitting related thereto. These services will also include Landscape, Hardscape and Irrigation system designs, in addition to parking lot and building vicinity lighting design. Also included in the Scope of Work are two (2) remote asphalt parking lots generally described as "Rec Area Lot" with approximately 150 spaces and "SoVi Admin Lot" with approximately 618 spaces. The proposed Scope of Work for the remote parking lots will include clearing, earthwork, drainage, paving, sidewalks, lighting, landscaping and other services as may be required for complete and compliant facilities. Florida Gulf Coast University (University or FGCU) invites the submission of Replies from interested and qualified corporations, partnerships, and other legal entities authorized to do business in the state of Florida for the opportunity to perform design-build services. This project involves design and construction of a 6-story, 189-unit / 535- bed, student dormitory facility of approximately 170,109sf. SoVi Bldg. 6 will be a Class 1B fully-sprinklered building in Residential Group R-2 (dormitory) classification. Question Deadline 06/17/2026 at 5:00 PM ET Questions Online Portal
GC Bidding
Educational
$131,761,755.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2026
September 1, 2027
Multiple Locations, Fort Myers, FL
Related To This Project
Fort Myers, FL
Bid Date: Jun 22 2026
Fort Myers, FL
--
Fort Myers, FL
Bid Date: Jul 13 2026
Fort Myers, FL
Bid Date: Jul 01 2026
Fort Myers, FL
Bid Date: Jul 09 2026
Fort Myers, FL
Bid Date: Jul 10 2026
Fort Myers, FL
Bid Date: Jul 13 2026
Fort Myers, FL
Bid Date: Jun 29 2026
Fort Myers, FL
Bid Date: May 28 2026
Fort Myers, FL
Bid Date: Jun 23 2026
Fort Myers, FL
Bid Date: Jun 23 2026
Fort Myers, FL
Bid Date: Jun 22 2026
Fort Myers, FL
Bid Date: Jun 10 2026
Fort Myers, FL
Bid Date: May 21 2026
Fort Myers, FL
Bid Date: May 26 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
