Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 28, 2026 at 8:00 PM

Updated September 3, 2026

Site work for a playground / park / athletic field in Tabiona, Utah. Completed plans call for site work for a playground / park / athletic field.

GJ26-151 DCSD Tabiona School Campus Track And Field Construction Project The Issuing Office for the Bidding Documents is Duchesne County School District (DCSD). This is a procurement opportunity for the DCSD Tabiona School Campus Track and Field Construction Project. Interested parties must review the solicitation in its entirety to ensure compliance with all requirements. The solicitation is not handled by the Division of Purchasing, and responses should be directed to the designated individuals or offices as indicated. The evaluation, processing, and notifications will be managed by DCSD according to the instructions provided in the solicitation. New Track and Field for Duchesne Country School District, Tabiona, UT, and associated site work. Question Deadline 06/05/2026 at 5:00 PM MT Questions may be mailed or e-mailed to: Keni Althouse, Design West Architects 255 South 300 West, Logan, Utah 84321 E-mail: kenia@designwestarchitects.com Demo Limit of work - rotomill on west up to parking lot , grading extents to the north , out to road pavement on south All trees and shrubs in fence to remove , remove sign , but keep concrete base Site 6 - lane track natural grass infield o o throwing event spaces o fence replacements o surrounding sidewalks on -street parking bleachers & small press box Bid Alternates # 1, gravel instead of rotomill # 2 , post -tension concrete track # 3 , sound system #4 , sports lighting Planting #5 , pre unit cost to excavate and replace with fabric & structural fill Rock underneath bleachers o Rock on south side o Grass & trees Irrigation Two different systems / controllers Keep the north system running during construction o Reuse the controller for the field area , rerun wire o Check the PSI available before work ! o Fenced in POC yard with additional equipment and wye strainer on pump

Award

Playgrounds / Parks / Athletic Fields

$3,400,000.00

Public - County

Site Work

24

20

5

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
54
Bidding Soon
1,219
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2026

June 22, 2026

Project location map

10 N Main St, Tabiona, UT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed