BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2026 at 8:00 PM

Updated June 16, 2026

Site work for a water / sewer project in Churchill, Manitoba. Completed plans call for site work for a water / sewer project.

The Work includes the upgrade of water and wastewater system at Missi Falls Control Structure South Indian Lake Manitoba. The Work includes the following items: incidentals (max 10% of total), mobilization and demobilization (max 20% of total), topsoil stripping and stockpiling, site clearing, excavation and backfill for septic field, supply and install septic field assembly with all required piping materials, supply and install septic tank assembly with all pumps, pressure filter, internal hoses and fittings and valves, control panels, required materials, floats, retrieval wire, insulation and heat trace, supply and install sewage lift station assembly with all pumps, control panels, required materials, insulation and heat tracing, supply and install DR11 HDPE sewer forcemain, preinsulated and heat traced, connection to the existing sewer line, electrical supply from electrical services building for wastewater components, water treatment plant upgrade, supply and install DR 11 HDPE watermain, preinsulated, and double heat traced, topsoil and seeding, O&M manuals, start-up, demonstration, commissioning and training, and supply spare parts. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Deadline 06/15/2026 at 12:00 PM CT

GC Bidding

Water / Sewer

$5,000,000.00

Public - State/Provincial

Site Work

32

18

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
8
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2026

August 2, 2026

Project location map

Missi Falls, Churchill, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.